71A3071B.html |
RA Range: 22:18
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.8 2CLR 2.0 0.0 120 deg
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
MOS with offsets. Note 1) They require another guide star than the one used for the pre-imaging. 2) They use a non-standard setup, but they still need a flux calib standard for this setup. Markus asked me to make sure this need was stressed here as well as in the README file. He also told me not to count it against the allocation. 3) This is now the third attempt to construct a set of masks which may be possible to insert. Hope it works this time :-) I discussed (with Gianni) a possible strategy which is to tell them: "OK with those masks, BUT if anything happens during OB execution which can be traced to the masks (e.g. mask insertion failure), then all technical downtime following from this will be charged against the allocation". As it stands now this programme has absorbed over 10 times as many USG resources as typical SM programmes. 4) Waiver was granted for OB length of 2 hours. 5) PI requested immediate release of the data of the first OB to be executed, just to check. I told them not to expect this to happen, but I'll leave it up to PSO to decide. 6) Good luck with it.
README of this run: