271.B-5019(A)

PI:Eckart/ Ott/ Genzel/ Schoedel/ Viehmann/ Straubmeier/ Morris/ Baganoff

271B5019A.html


Last update of this page: Mon Jun 23 17:45:08 2003
Last update of the USG file: Jun 18 10:48:36 2003


Major Instrument Modes: SWI

RA Range: 17:45

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 1.0 3THN 2.4 1.0 30.0


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? Yes! ToO? No! Carry-over run? No!


Special Remarks:
PLEASE READ **VERY CAREFULLY** THE README FILE FOR PROCEDURAL INSTRUCTIONS!


 
 
These are VERY IMPORTANT observations of the Galactic Center which are to
be done *simultaneously* with Chandra observations.  The seeing specified
in the OBs is 1" (simply for purposes of setting up the AO), but
under ANY seeing conditions observations should be carried out.
PLEASE pay VERY CLOSE attention to the instructions in the README file
for NAOS configuration/setup, offsets, etc.  

IMPORTANT NOTES:
1. Since the time windows for these observations are fixed and the OBs are
   identical, USG has allowed a seeming "oversubscription" of the
   allocated time (some acquisitions are not required).  Please
   account for the time in a fashion similar to a ToO Run. 
2. USG has approved the use of 1" for the seeing rather than 2" as would
   be the case when "n" is specified in the proposal.
3. Although the airmass at 23:00 will be in violation of that in the
   Constraint Set and .aocfg file (the maximum available [2.4] was
   used) please proceed in any event.


 


Information about the progress of this run:

Run status page 271.B-5019A

README of this run:

271.B-5019A.README


Finding charts for this run:
Check if directories exist:
P69 Directory does not exist for 271.B-5019A
P70 Directory does not exist for 271.B-5019A
P71 Directory exists for 271.B-5019A