072.C-0264(B)

PI:Hatzes/ Cochran/ K\"urster/ Endl/ Paulson

Rank Class: B


072C0264B.html


Last update of this page: Fri Apr 2 13:45:54 2004
Last update of the USG file: Aug 19 14:30:00 2003

Major Instrument Modes:

RA Range:

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
2.0 3THN 5.0 1.0 30


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? Yes! ToO? No! Carry-over run? No!


Special Remarks:
must be executed around January 2004.


 

This programme is divided into two runs, A) and B). The runs are
very similar and are meant to observe the same targets at two
different epochs, separated by about 5-6 months. Run B) should be
executed in January 2004.

IMPORTANT NOTE: The OBs are grouped into two classes: _iodine_ and
_template_: their execution is independent. BUT each time at least
one of the _template_ OBs is executed, one of the pairs
HR948_template/HR948_iodine MUST be executed, the _iodine_ having
the highest priority. If during a night NO _template_ OBs are
executed, NO HR948_template/HR948_iodine should be executed.
On the other hand, if more than one _template_ OB is executed,
ONLY ONE pair HR948_template/HR948_iodine has to be executed.

For more details see the README file.


 
 


Information about the progress of this run:

Run status page 072.C-0264B

README of this run:

072.C-0264B.README


Finding charts for this run:

Check if ftp directory/ies exist/s for this run:
P71 Directory does not exist for 072.C-0264B
P72 Directory exists for 072.C-0264B
P73 Directory does not exist for 072.C-0264B
P74 Directory does not exist for 072.C-0264B