NTT handover E. Pompei -> I. Saviane

Meeting: La Silla, December 7, 2006

Present: I. Saviane, A. Gilliotte, E. Pompei, R. Parra, J. Miranda (P. Le Saux part of telescope team, but coming up tomorrow)

1 VLT standardization

2 Rotators

2.1 General

2.2 A

2.3 B

3 Mirrors

3.1 M1

(incidentally mechanics are making new boogies for the 3.6m dome; these will have shock absorption via springs instead of the problematic rubber; eventually there should be at least 6 boogies of this new type)

3.2 M2

3.3 M3

4 Future technical time

5 Administration