(P. Le Saux part of telescope team, but coming up tomorrow)
- email from Sep 15 from msterzik endorses course of action; project
manager to be decided.
- system lacks predictive power; e.g. should be able to guess whether
there is enough time for the next exposure, before reaching the limit;
presetting to parallactic angle always require going to zero position
first; etc.
- Maintenance coming soon: next Saturday, Dec 9. Tech CCD of AG camera
will be replaced as well. R. Parra gives Gantt chart of project. End
milestone on Dec 18.
- Sometimes it has not enough strength: this causes vibrations when
trying to move it; workaround is to do an init at 0
, move
it to 10
and do a second init in that position
- Maintenance to be done (three nights); was in Nov but canceled due
to 3.6m dome problem. New date will be decided when P79 schedule becomes
available
- motors driving the actuators are being changed
- 100 new motors are available
- motor replacement is slow because mechanics are busy with 3.6m dome;
only 7 (maybe 8?) installed so far
- there are 75 actuators + 3 fixed points
- the best of old motors are kept as spares: 'best' motors are those
showing low power consumption
- M1 is tilted (since long time); should be fixed, but then requires
re-adjustment of lateral pads
- Each time the mirror cell is dismounted, there are jumps in the pointing
model
- SUSI2 IQ is often bad after I.A.; cause could be a wrong model for
the radial dependence of astigmatism; workaround is to do I.A. at
center field; under investigation by M. Stefanon (for precise astrometry
program by Ducourant); need a tech night with exceptional seeing to
investigate (Alain);
(incidentally mechanics are making new boogies for the 3.6m dome;
these will have shock absorption via springs instead of the problematic
rubber; eventually there should be at least 6 boogies of this new
type)
- Mirror - astatic levers interface changed; i.e. design error fixed
- Mirror - astatic levers interface changed; i.e. design error fixed
- Jan 27: s/w tech
- Jan 29: M1 wash followed by pointing model
- March 27-30: s/w tech
- See tech time to set milestones for VLT standardization
-
| NTT 'IOT': |
I. Saviane
A. Gilliotte
R. Parra
J. Miranda
P. Le Saux
J. Luhrs
ls-ntt@eso.org
/sci/facilities/lasilla/telescopes/ntt/nttoperations/
|
- kila nttt account has all the s/w tools, e.g. to measure optical aberrations