LaSilla Technical Time Schedule - P81 |
Version: 2008-03-11 isaviane: first release P81 |
Technical
Time Schedule
Below is the
actual technical schedule for the current period.
This
schedule is highly dynamical and will change frequently.
Latest version of the official LaSillaParanalObservatory schedule
To book a slot, please send your technical time requests to isaviane@eso.orgNight | Responsible | Activity | Comment |
April-01 | isaviane; JRE | period changeover | SOFI templates commissioning, after change made by plesaux (LPRS-009314); ALL instruments except EMMI: installation of last version ohsls module
|
April-04/07 | jscharwa/plesaux | test TCS templates of EFOSC2 | |
April-08/09 | LED | EFOSC2 preparation | 8-14 also test templates on-sky with PLE |
April-14/26 | isaviane/lmonaco | EFOSC2 commissioning | |
May-24 | |||
June-14/16 | TBD | check and repair Azimuth and Altitude motors electric collectors | Sent by Gerardo on Mar 15, more will come |
June-17/21 | LED | M1 recoating | |
July-17/18 | |||
July-25 |
Night | Responsible | Activity | Comment |
April-01 | lmonaco, JRE |
period changeover | ALL instruments except EMMI: installation of last version ohsls module |
June-19 | |||
July-20/21 |
Night | Responsible | Activity | Comment |
April-01 | oschuetz, JRE | period changeover | ALL instruments except EMMI: installation of last version ohsls module |
July-10/11 | |||
July-24/25 |
Night | Responsible | Activity | Comment |
|