LaSilla Technical Time Schedule - P78 |
Version: 2007-03-16 oschuetz: 2p2 updated for end of March 2006-09-27 msterzik: NGAS upgrade in November; 3p6 dome
maintenance anticipated; 3p6/TCCD cancelled - no plan. |
Technical
Time Schedule
Below is the
actual technical schedule for the current period.
This
schedule is highly dynamical and will change frequently.
Latest version of the official LaSillaParanalObservatory schedule
To book a slot, please send your technical time requests to msterzik@eso.orgNight | Responsible | Activity | Comment |
01OCT | isaviane | period changeover | |
02-03OCT | jluhrs/gvaldes | EMMI LINUX: pre-release | 4h daytime each, 3OCT:2h night (cal.plan) |
08NOV | rotator B maintenance |
cancelled. returned to SciOps (service)
|
|
03-08NOV | jluhrs/gvaldes | EMMI LINUX | 9NOV (cal. plan) verification |
09-11DEC | elec | ||
18DEC |
rotator A maintenance | SciOps re-commissioning (csnodgras, ebarrios, plesaux) | |
12-18DEC | psinclair | A side: 2 NGTCCD replacements | done during an EMMI run |
13-18DEC | vgonzale | SOFI LINUX | 18DEC system verification |
27-28JAN | soft | ||
29JAN | mirror washing | ||
27-28MAR | jluhrs/ikastin | IA module; Actis CPU on AG | swap with calibration plan nights. Now 29-30MAR. |
Night | Responsible | Activity | Comment |
01OCT | msterzik | period changeover | |
02-04OCT | dome maintenance | anticipated
to 25-29Sep |
|
02OCT |
elec |
- remove old lateral pads PC |
no telescope movement |
03OCT |
psinclai |
TCCD |
cancelled.
|
04OCT |
psinclai |
TCCD |
cancelled. |
29OCT | agillio |
measure M1 cell position and lat. pads-cell distance |
open adapter |
30OCT |
agillio |
calibration of electrovalves and load cells |
could observe at night |
31OCT |
agillio |
I.Q. |
|
all OCT | rtamai | dome maintenance | |
28NOV-5DEC | vgonzale/jreveco | HARPS+CES LINUX, during daytime. | 5DEC (HARPS setup) for system verification |
01-04DEC |
agilliot | L3 EFOSC | email from psinclair (22Sep).
SciOps support from ebarrios and isaviane |
23JAN | elec | Delta strip encoder (day) /
pointing model (night) |
could observe at night |
24JAN |
elec |
Interlock system upgrade |
could observe at night |
30-31JAN | jluhrs | TCS Linux | 1FEB (HARPS, calib) might be required for system verification. |
12-14FEB | gvaldes | EFOSC Linux | 14FEB for verification |
13-14FEB | agillio |
mirror maintenance (M2 shimming)/washing/IQ |
Night | Responsible | Activity | Comment |
02OCT | ikastine | VLTSW patch for w2p2ins, wferos, w2p2tcs + OFFSAG correction | 3h + 2h daytime access COMPLETED: 2SEP06 |
02OCT | fselman | period changeover | system verification |
02OCT | jalonso | TCS amplifier exchange | |
03-07OCT |
psinclair | WFI decontamination | detailled planning see LSO-00434 |
08OCT | fselman | WFI re-characterization | |
02DEC | elec | ||
03-04FEB(!tbd!) | jreveco | FEROS Linux | 5FEB (service) verification |
27MAR | jluhrs |
combined offset tests for
GROND |
all
details here |
28MAR | rparra |
interlock chain audit |
|
29-31MAR | gear box |
Night | Responsible | Activity | Comment |
26-30NOV |
jparra | NGAS upgarde | daytime activity |
|