LaSilla Technical Time Schedule - P78

Version:

2007-03-16 oschuetz: 2p2 updated for end of March
2007-02-22 msterzik: NTT end of March: software

2006-09-27 msterzik: NGAS upgrade in November; 3p6 dome maintenance anticipated; 3p6/TCCD cancelled - no plan.
2006-09-25 msterzik: L3/EFOSC from psinclair; WFI decontamination from fselman
2006-09-07 msterzik: NTT/EMMI from jluhrs

2006-09-04 msterzik: 3p6 detailed planning from glocurto
2006-08-21 msterzik: update (LINUX porting plan: LSO-PLA-ESO-80000-0012)

Technical Time Schedule

Below is the actual technical schedule for the current period.
This schedule is highly dynamical and will change frequently.

Latest version of the official LaSillaParanalObservatory schedule

To book a slot, please send your technical time requests to msterzik@eso.org
All requests will be considered if they can be accommodated within the available time and the priorities.
Priorities are set according to actual operational needs and the original technical time requests as submitted before the beginning of the period. 


NTT

Night Responsible Activity Comment
01OCT isaviane period changeover
02-03OCT jluhrs/gvaldes EMMI LINUX: pre-release 4h daytime each,
3OCT:2h night (cal.plan)
08NOV
rotator B maintenance
cancelled. returned to SciOps (service)
03-08NOV jluhrs/gvaldes EMMI LINUX 9NOV (cal. plan) verification
09-11DEC elec

18DEC

rotator A maintenance SciOps re-commissioning (csnodgras, ebarrios, plesaux)
12-18DEC psinclair A side: 2 NGTCCD replacements done during an EMMI run
13-18DEC          vgonzale  SOFI LINUX   18DEC system verification
27-28JAN soft

29JAN
mirror washing
27-28MAR jluhrs/ikastin IA module; Actis CPU on AG swap with calibration plan nights. Now 29-30MAR. 
                 

3.6m 

Night Responsible Activity Comment
01OCT msterzik period changeover
02-04OCT
dome maintenance anticipated to 25-29Sep
02OCT
elec
- remove old lateral pads PC
- relocate lateral pads electrovalves
- fix temporary connections to lat. pads cables
no telescope movement
could observe at night
03OCT
psinclai
TCCD
cancelled.
04OCT
psinclai
TCCD
cancelled.
29OCT agillio
measure M1 cell position and lat. pads-cell distance
open adapter
could observe at night
30OCT
agillio
jalonso
calibration of electrovalves and load cells
could observe at night
31OCT
agillio
I.Q.

all OCT rtamai dome maintenance
28NOV-5DEC vgonzale/jreveco HARPS+CES LINUX, during daytime.  5DEC (HARPS setup) for system verification
01-04DEC
agilliot L3 EFOSC email from psinclair (22Sep). SciOps support from ebarrios and isaviane
23JAN elec Delta strip encoder (day) / pointing model (night)
could observe at night
24JAN
elec
Interlock system upgrade 
could observe at night
30-31JAN jluhrs TCS Linux 1FEB (HARPS, calib) might be required for system verification.
12-14FEB gvaldes EFOSC Linux 14FEB for verification
13-14FEB agillio
mirror maintenance (M2 shimming)/washing/IQ
                 

2.2m

Night Responsible Activity Comment
02OCT ikastine VLTSW patch for w2p2ins, wferos, w2p2tcs + OFFSAG correction 3h + 2h daytime access COMPLETED: 2SEP06
02OCT fselman period changeover system verification
02OCT jalonso TCS amplifier exchange
03-07OCT
psinclair WFI decontamination detailled planning see LSO-00434
08OCT fselman WFI re-characterization
02DEC elec

03-04FEB(!tbd!) jreveco FEROS Linux 5FEB (service) verification
27MAR jluhrs
combined offset tests for GROND
all details here
28MAR rparra
interlock chain audit
29-31MAR
gear box
                                

General

Night Responsible Activity Comment
26-30NOV
jparra NGAS upgarde daytime activity
                 