Reports from Michel Fleury -------------------------- 09.10.2006 between 11h and 16h: ================================ - HA Isolation Box opening - on HA-DU CFC => replacing vacuum gauge PKR 251, No 1 (CCD vacuum quality monitoring) installed 18.01.2005, by No2 - spare, same model - HA-DU pumping / CCD always cold, during all operations HA-DU pressure: - before operations => => 1.6 x 10E-6 mb (measured by PKR No 1) - after operations / 45 min pumping / 16h => 4.1 x 10E-6 mb (mesured by PKR No 2) - pumping will be running all next night - in November 2006 PKR No 1 should be refurbished at Geneva Observatory, and it will later be sent back to LSO - VV outside Foot S2 TEMP29: temperature sensor => mouved on IB base-carpet foam for floor temperature annual monitoring. 10.10.2006 ========== - HA-DU sorption pump regeneration (CCD vacuum) => after yesterday PKR CCD vacuum gauge swaping, sorption pump in HA-DU CFC (CCD cryostat) has been regenerated (end of job => this afternoon) - Monitoring 3.6m HA-HR floor temp => moved yesterday from VV-1 skin to the top of IB ground foam is now located under this foam, directly fixed on HA-HE floor => monitoring the HA-Room concrete 3.6m bulding floor temp