Introduction

After discussion with Peter Sinclaire it became clear that the startup policy was not optimized to the needs of both the detectors and the workstations. A meeting was therefore deemed necessary between the detector and the software team with SciOps to try to find the optimum way for the instrument startup.

Meeting

The meeting took place on the morning of July the 14th at the RITZ.
Were present:
Tzu-Chiang Chen, Juan Carlos Guzman, Bhernard Lopez, Ruben Soto, Peter Sinclaire, Gaspare Lo Curto, Emanuela Pompei, Eduardo Matamoros.

Present situation

Presently at instrument startup the DCS software is stopped and then started again. Different instruments have a different policy for the startup: every day / every x days etc..

Hardware concerns

The concern raised by Peter Sinclaire is that stopping the DCS software effectively turns off the detector, and if this is done every day at startup it introduces unnecessary stress and it can be source of instabilities on the system.
On HARPS, for example, each time the DCS is stopped and then restarted the bias level changes by up to 50 ADU.
From the detector point of view the ideal would be to never turn off the detector unless it is really needed; in any case do not turn off the detector as a standard preventive maintenance operation.

Software concerns

Software recommends, as a form of preventive maintenance to do a complete instrument startup, shutting down the instrument workstation environment and starting it up again. This operation also kills two processes that interface the instrument workstation with FIERA. The only way to re-establish a correct connection between the instrument workstation and FIERA at that point is to stop and start up the DCS software.

There is the possibility that with the new VLT upgrade to the April 2004 software version there would be no need anymore of frequent complete instrument startup, but this has to be verified, it is only speculation at the moment.

Actions proposed

The actions proposed are on two fronts:
1) Contact Garching (and/or open an SPR) to evaluate the possibility to not turn off the detector at DCS startup if the interface processes with the instrument workstation are still running, or in any case to optimize the DCS startup function to avoid unnecessary stress to the detectors. This should be taken care by Peter Sinclaire.
2) Meanwhile reduce the number of complete instrument startups (including reboot of the machines) at once per week, avoiding when possible to do it in the middle of short visitor runs. Only those systems upgraded to the VLT software version of April 2004 should be subject to this new procedure.
3) Software will send an e-mail to SciOps (possible on Monday 19 July 2004) with a proposal of an Instrument full start-up sequence, including rebooting the machines.