GROND RRM procedural sequence

Everyday action

Action for a Gamma-Ray Burst

In Short:

The full story:

  1. A satellite is detecting a GRB, and automatically distributing the coordinates over the Web, including to the GROND computer in the 2.2m dome (so-called pipeline machine, or PM).
  2. This alert is processed by the PM, e.g. coordinates are checked for visibility and weather.
  3. If all conditions are met, a Rapid Response Mode trigger is created, and send to the GROND Instrument workstation (IWS) in the RITZ.
  4. VLT RRM jingle will sound in the RITZ, beeper #62 will ring and the phones 4551 and 4552 will be called by software. (2nd beeper #12 will ring if the IWS or PM fail.)
  5. Alarms will sound each time a new GRB afterglow position is submitted by the GRB satellite. In case of Swift, this will be up to four(!!) times (BAT, XRT, XRT UPDATE and/or UVOT). These four alarms can come immediately one after the other, or can be separated by a few minutes.
  6. A window pops up asking the TIO whether or not to accept the RRM trigger (e.g. bad weather conditions, technical problems).
  7. If no technical objections exist, the TIO should hit the "Start/Yes" button to start the RRM immediately, i.e. before the 30 sec are over).
  8. If the TIO does not react within 30 sec, the GROND RRM OB will be executed fully automatically:
    1. The running exposure of either WFI, FEROS or GROND will be stopped, data will be read out and saved to disk.
    2. The telescope and the dome will pre-set to the GRB coordinates.
    3. The autofocus will be switched off, and the telescope's M2 will be moved to GROND's focus (computed on the template level).
    4. GROND's M3 will be moved into the beam and the main shutter in front of GROND's entrance window will be opened.
    5. The RRM BOB now automatically passes action over to the normal BOB and executes an imaging OB with a duration of 6 min. No guiding is needed, since the longest exposure is 1 min. In total, 1 min exposures are executed at four different telescope dither positions.
    6. A second OB with a duration of 4 min will be executed automatically, still without guiding. BOB is configured for "Auto-execute", so no intervention of the TIO is required/requested.
    7. Data are send to DHS, and from there to the offline machine, and the pipeline machine (PM). The PM tries to identify the GRB afterglow, determine its brightness, and adjust the exposure time of the next OB accordingly (not yet fully working).
    8. If the data reduction pipeline has not identified a bright GRB afterglow, the next OB to be executed automatically will have a duration of 8 min.
    9. In any case, the TIO is asked to pick a guide star and start guiding.
    10. The system will automatically continue executing further OBs until the end of the visibility of the target. This may take up to 4-5 hrs. The automatically created schedule will be visible on a special Web-page (wgrpipe.ls.eso.org:9222/gp/night.html). All these new OBs are created such that the guiding should remain active. Nevertheless, the TIO should regularly check that guiding is active.
    11. After the end of observations with GROND, a special OB is executed automatically which takes off M3, and closes GROND. Thereafter, WFI and FEROS observations can resume. Note that the Autofocus is off, so you may want to switch it on again.
    12. Before starting FEROS/WFI observations, you should manually (i) Set autofocus ON, and (ii) switch to WFI pointing.
Jochen Greiner (jcg@mpe.mpg.de), last update: 30-Nov-2007 [Disclaimer]