Complete ISO 9001 implementation, following recommendation of the
audit (C,1)
Make SciOp documentation ISO-complient; implement version
control and repository access (2)
Calibration plan: implement and document CALOB calibration plan
for all VLT-complient instruments (2)
Implement quick look tools for all instruments (Imaging: seeing
and exposure level; Spectro: 1D extraction and wavelength calibr;
Echelle: "guess-sessions"). Implementation within SciSoft (ideally
Midas). (2)
Organize a "Calibration Plan Party" to present
the status of the CalPlan, during the stay of the DG in Chile. (M, 1)
Instrumentation
Complete TIMMI2's big-bang, including DFS back-end (2)
New generation NTT instrument (C, 1) Concepts should be
presented to STC in April. FDR should be passed before the end of the
year. This should be a fast instrument to replace EMMI in a 2-year
time-scale.
Support the efforts to install GROND on the 2.2m
telescope. Develop and implement methodology to cope with the GRB
alerts for GROND. (C, 1)
FEROS' big-bang (C, 1)
Implement FEROS ADC (C, 1)
Study CES polarimetry, implement if possible and required
by LS2006+ Committee (C,1)
Complete 3.6m M2 upgrade in time for HARPS operation (C, 1)
HARPS commissioning and operation (C, 1)
Operation from RITZ of 2.2m and 3.6m (C)
Study/re-engineer SciOp scheme together with Paranal. (M, 1)
Operation of the NTT (C, all yr)
At night, operate the telescope at maximum efficiency and full
capabilities of the system. At day, perform operation/maintenance/calibration
plan according to procedure, always aiming at maximum performance of the system.
SUSI2 Tio (C, all yr)
Follow-up and track problems related to the SUSI2, according to LSO/Sciop Re-
engineering plan.
Operation from RITZ (M, all year)
Apart of NTT, Karla shall:
Learn how to operate 2p2m Tel.and assist to 2p2 Tio in case of problems.
Complete ISO 9000 implementation (M, all yr) following
recommendation of the audit,related with operation procedures and
troubleshooting of SUSI2.
Operation of the ASM/DIMM (M, all yr)
Operate the telescope at maximum efficiency and full capabilities of the system.
Study/reengineering Scop scheme together with Paranal.(M, all yr)
Karla shall participate on working groups and discussions related with the theme.
Duncan Castex
TIO; Supervisor: J.Miranda, HoTIOa v: 2002-12-20
Operation of the NTT (C, all yr) At night, operate the
telescope at maximum efficiency and full capabilities of the
system. At day, perform operation/maintenance/calibration plan
according to procedure, always aiming at maximum performance of the
system.
EMMI Tio (C, all yr) Follow-up and track problems related
to the EMMI, according to LSO/Sciop Re- engineering plan.
Operation from RITZ (M, all year) Apart of NTT,Duncan
shall: Learn how to operate 3p6m Tel.and assist to 3p6 Tio in case of
problems.
Complete ISO 9000 implementation<,(M, all yr) following
recommendation of the audit,related with operation procedures and
troubleshooting of EMMI.
Operation of the ASM/DIMM (M, all yr) Operate the telescope
at maximum efficiency and full capabilities of the system.
Study/reengineering Scop scheme together with Paranal.(M,
all yr) Duncan shall participate on working groups and discussions
related with the theme.
Operation of the NTT (C) At night, operate the telescope at maximum
efficiency and full capabilities of the system. At day, perform operation/maintenance/calibration
plan according to procedure, always aiming at maximum performance of the system.
Operation from RITZ (C) Mónica will continue to operate NTT from
the RITZ and also she shall learn how to operate of 2p2 telescope and assist
to 2p2 TIO in case of problems. DIMM/ASM, she shall monitor the automatic
work of the system, and troubleshoot it when needed.
Windows PC system maintenance (D) Monica is in charge of the
system maintenance and administration for the NTT and 2p2 Windows PCs. This
includes troubleshooting and upgrades, as well as monitoring of the consumables.
This also include enforcing the useage etiquette (software used/installed,
disk space, etc.) [Goal removed during the year]
Study/re-engineering SciOps scheme together wit Paranal (M) Monica
shall participate on working groups and discussions related with the theme.
Pointing model monitoring and coordination (D) Monica shall be in
charge of the overall pointing model analysis, implementation and monitoring:
-Monica shall monitor the accuracy of the pointing models, and request that
new pointing model be acquired and installed when needed.
-Monica shall perform the pointing model data reduction and installation;
she shall decide of which model has to be used for observations.
-Monica shall monitor the evolution of the pointing model parameters.
Test and debug OSF (D, all year) The OSF software (automatic start-up
check list) will be implemented during the period. With the operation engineer,
Monica shall help testing and debugging this system.
2p2 Tel. Deputy Significance: D, all yr Assist the 2p2 TIO as needed
Complete ISO 9001 implementation (M, all yr) Monica shall participate
in implementation of the ISO 9001 following recommendation of the audit, related
with operation procedures and troubleshooting of 2.2m telescope.
Operation of the 3.6m (C)
During nighttime, operate the telescope at maximum efficiency and full
capabilities, while maintaining the security of the people and
equipment.
-he shall get informed about the improvements and changes of the system,
-he shall get the necessary knowledge in order to be able to
troubleshoot the system, during night operation.
-he will assist the astronomers with their observations. During
daytime, he shall operate the 3.6m system.
-the execution of the calibration/maintenance plan.
-the instrument set-up, and monitoring and cooling of the CCDs, and
the Start-up of the system to get it ready for the night.
Study/re-engineering SciOps scheme together with Paranal (M)
José shall participate on working groups and discussions related with
the theme.
ISO 9000 (M)
José shall complete ISO 9000 implementation following recommendation
of the audit, related with operation procedures and troubleshooting of
3.6m Telescope.
Complete 3.6m M2 upgrade (C)
José shall participate actively in 3.6m M2 upgrade, he will in charge
of 3.6m in order to make telescope documentation ISO-compliant.
Operation from RITZ (M)
Apart of 3.6m, José shall learn how to operate NTT and DIMM telescope,
and assist the 2.2m in case of problems.
Full training in TIMMI2 operations (M)
José shall learn to how to operate TIMMI2 during day and nighttime.
Operation of the 2.2m (C) During nighttime, operate the
telescope at maximum efficiency and full capabilities, while
maintaining the security of the people and equipment.
-he shall get informed about the improvements and changes of the
system,
-he shall get the necessary knowledge in order to be able to
troubleshoot the system, during night operation.
-he will assist the
astronomers with their observations. During daytime, he shall operate
the 2.2m system.
-the execution of the calibration/maintenance plan.
-the instrument set-up, and monitoring and cooling of the CCDs, and
the Start-up of the system to get it ready for the night.
Study/re-engineering SciOps scheme together with Paranal
(M) Cristian shall participate on working groups and discussions
related with the theme.
ISO 9000 (M) Cristian shall complete ISO 9000
implementation following recommendation of the audit, related with
operation procedures and troubleshooting of WFI.
WFI TIO (C) Follow-up and track problems related to the
WFI, according to LSO/SciOps re-engineering plan.
Operation from RITZ (M) Apart of 2.2m, Cristian shall learn
how to operate NTT and DIMM telescope, and assist the NTT in case of
problems.
FEROS Instrument (M) Cristian shall learn how to operate
FEROS instrument, and he will participate in FEROS’ big-bang.
Andres Gonzalez
TIO; Supervisor: J.Miranda, HoTIOa v: 2002-12-20
Operation of the 3p6m(C, all yr) At night, operate the
telescope at maximum efficiency and full capabilities of the
system. At day, perform operation/maintenance/calibration plan
according to procedure, always aiming at maximum performance of the
system.
HARPS Tio (C, all yr) Follow-up and track problems related
to the HARPS, according to LSO/Sciop Re- engineering plan.
CES & TIMMI2 Tio Deputy (M, all year) Follow-up and track
problems related to the CES & TIMMI2 (Tio Deputy), according to
LSO/Sciop Re- engineering plan.
Complete ISO 9000 implementation(M, all yr) following
recommendation of the audit,related with operation procedures and
troubleshooting of HARPS.
Operation of the ASM/DIMM (from Ritz)(M, all yr) Operate
the telescope at maximum efficiency and full capabilities of the
system.
Study/reengineering Scop scheme together with Paranal.(M,
all yr) Andres shall participate on working groups and discussions
related with the theme.
Carlos La Fuente
TIO; Supervisor: J.Miranda, HoTIOa v: 2002-12-20
Operation of the 3p6m (C, all yr) At night, operate
the telescope at maximum efficiency and full capabilities of the
system. At day, perform operation/maintenance/calibration plan
according to procedure, always aiming at maximum performance of the
system.
EFOSC2 Tio (C, all yr) Follow-up and track problems related
to the EFOSC2, according to LSO/Sciop Re- engineering plan.
2p2m Telescope Operation (M, all year) During the year
Carlos shall learn how to operate the 2p2m telescope and their
instruments and be able to operate it from RITZ.
Complete ISO 9000 implementation,(M, all yr) following
recommendation of the audit,related with operation procedures and
troubleshooting of EFOSC2.
Documentation Officer - ISO9000 compliant (M, all yr)
Carlos shall ensure a level of web-based documentation as
complete as possible, following the established standards including
manuals, technical reports, inventories, stock keeping, operational
procedures, checklists, troubleshooting guides.
-Carlos shall actively contribute to the transfer of the
documentation (both on-line and paper) to the ISO 9000 standards.
-Carlos shall Keep the available documentation in the control
room always up-to-date. This includes to screen the book shelves
regularly, remove and clean unused items, and take the necessary
precautions that the shelf is always in perfect order.
Study/reengineering Sciop scheme together with Paranal.(M,
all yr) Carlos shall participate on working groups and discussions
related with the theme.
Francisco Labrana
TIO; Supervisor: J.Miranda, HoTIOa
v: 2002-12-20
Operation of the 2.20 (C, all yr) At night, operate the telescope
at maximum efficiency and full capabilities of the system. At day, perform
operation/maintenance/calibration plan according to procedure, always aiming
at maximum performance of the system.
2.2m Telescope TIO (C, all yr) Follow-up and track problems related
to the 2.2m, according to LSO/Sciop Re- engineering plan.
Operation from RITZ (M, all year) Apart of 2.20, Francisco shall:
Learn how to operate NNT and DIMM/ASM.
Complete ISO-9000 implementation(M, all yr) following recommendation
of the audit,related with operation procedures and troubleshooting of 2.2mtelescope.
2.2m Documentation Officer(M, all yr) Francisco is the 2.2m telescope
documentation officer. Francisco shall lead the update documentation of the
2.2m telescope and their instruments to the ISO 9001 Standard, and he shall
be in charge of the paper documentation of the 2.2m, and their electronic
version. He shall attribute document Nrs to new document, he shall collect
the electronic source of the documents, keep and organize them in the electronic
repository. He shall make sure that the printer versions of all documents
presents in the control room are up-to-date.
Study/reengineering SciOps scheme together with Paranal(M, all yr)
Francisco shall participate on working groups and discussions related with
the theme.
Mauricio Martinez
TIO; Supervisor: J.Miranda, HoTIOa v: 2002-12-20
Operation of the 2.20 (C, all yr)
At night, operate the telescope at maximum efficiency and full
capabilities of the system. At day, perform operation/maintenance/calibration
plan according to procedure, always aiming at maximum performance of the system.
WFI deputy TIO (C, all yr)
Follow-up and track problems related to the WFI, according to LSO/Sciop Re-
engineering plan.
Operation from RITZ (M, all year)
Apart of 2.20, Mauricio shall:
Learn how to operate NNT and DIMM Tel. and assist the NNT TIO in case of problems.
Complete ISO-9000 implementation,(M, all yr) following
recommendation of the audit,related with operation procedures and
troubleshooting of WFI.
Deputy to the 2p2 Documentation Officer(M, all yr)
Study/reengineering SciOps scheme together with Paranal(M, all yr)
Mauricio shall participate on working groups and discussions related with the theme.
Eduardo Matamoros
TIO; Supervisor: O.Hainaut, HoSciOp v: 2002-12-20
Head of TIO Section "B" (C, all year)
Together with the Head of TIO Section "A", organize the TIO
schedule, including training and vacation coverage. Perform G&O
definition and PR for the members of the section, following the
general SciOp G&O. Deputy to Head of
TIO Section "A".
Telescope Operation (C, all yr)
At night, operate the telescope at maximum efficiency and full
capabilities of the system. At day, perform
operation/maintenance/calibration plan according to procedure,
always aiming at maximum performance of the system. Eduardo's main
telescope is 3.6m, but he shall get certified on NTT and trained on
2.2m by Q4
TIMMI2 upgrade (C, Q1)
contribute to the finilization of the TIMMI2 big bang, by
defining, testing, implementing and fine-tuning the operation
procedures, together with TIMMI2 scientist and Op.Eng.
TIMMI2 TIO (M, all yr)
Remain THE specialist of TIMMI2 installation and operation; this
includes f/35 top end.
Follow-up and track problems related to TIMMI2.
ISO 9000 and Documentation project (M, Q2)
As TIMMI2 TIO, make sure that the recommendations of the ISO9000
audit are implemented in the area of TIMMI2. Monitor the TIMMI2
documentation and make sure it is up-to-date (either doing the
changes needed, or requesting them).
Safety (A, all year)
Assist the SciOp safety officer, esp. for the area of the 3.6m
telescope.
Perform (either directly or through delegation) a major cleanup of
the telescope buildings, aiming at having the telescope floors as
empty and organized as possible.
Jorge Miranda
TIO; Supervisor: O.Hainaut, HoSciOp v: 2002-12-20
Head of TIO Section "B" (C, all year)
Together with the Head of TIO Section "B", organize the TIO
schedule, including training and vacation coverage. Perform G&O
definition and PR for the members of the section, following the
general SciOp G&O. Deputy to Head of
TIO Section "A".
NTT Operation (C, all yr)
At night, operate the telescope at maximum efficiency and full
capabilities of the system. At day, perform
operation/maintenance/calibration plan according to procedure,
always aiming at maximum performance of the system.
NTT System Tester (C, all yr)
Test the systems, esp. new ones, in order to detect and identify
features, bugs, problems. Report them.
NTT TIO (M, all yr)
follow-up and track problems related to the NTT.
DIMM TIO / Coordinator (D, all yr)
follow-up and track problems related to the DIMM. In addition,
shall coordinate and follow up operations related to the DIMM (upgrades etc)
NTT Operation (C, all yr)
At night, operate the telescope at maximum efficiency and full
capabilities of the system. At day, perform
operation/maintenance/calibration plan according to procedure,
always aiming at maximum performance of the system.
Telescope training (C, all yr)
Complete training on 2p2 and 3p6
TIO trainer (C, all yr)
In charge of "setting the style" for telescope operations, both day
and night. In the 2003 schedule, each "junior" TIO should spend at least
one turno with Manuel.
SciOp Safety Engineer (C, all yr)
monitoring of safety in all SciOp premises and operations,
coordination of safety issues with La Silla Safety and Head of
SciOp.
Small optics maintenance (D, all yr)
monitor the surface conditions of small optics (filters, grisms,
EMMI, SuSI2, EFOSC2),
and coordinate maintenance with optics.
SofI TIO (M all yr)
Keep track of SofI related problems, make sure that they remain
active until solved. Assist the SofI Instrument Scientist as
needed.
ISO 9000 (D, Q3)
implement recommendation of the ISO9000 audit, and make SciOp
documentation complient. Manuel is in charge of this for SofI, as
coordinated by the SofI instrument scientist.
Study/Re-engineer a SciOp scheme together with Paranal. (M, Q4)
Manuel shall contribute.
Operation of the 3.6m (C)
During nighttime, operate the telescope at maximum efficiency and full
capabilities, while maintaining the security of the people and
equipment.
-he shall get informed about the improvements and changes of the
system,
-he shall get the necessary knowledge in order to be able to
troubleshoot the system during night operation.
-he will assist the astronomers with their observations. During
daytime, he shall operate the 3.6m system.
-the execution of the calibration/maintenance plan.
-the instrument set-up, and monitoring and cooling of the CCDs,
and the Start-up of the system to get it ready for the night.
CES TIO (C)
Gorky shall follow-up and track problems related to the CES, according
to LSO/SciOps Re-engineering plan.
ISO 9000 (M)
Gorky shall complete ISO 9000 implementation following recommendation
of the audit, related with operation procedures and troubleshooting of
CES.
Study/re-engineering SciOps scheme together with Paranal (D)
Gorky shall participate on working groups and discussions related with
the theme.
2p2 Telescope Operation (M)
During the year Gorky shall learn how to operate the 2p2m telescope
and their instruments (WFI + FEROS) and be able to operate it from
SciOps Control Room.
MIDAS and calibration quality control (D)
Gorky shall continue his training in order to be able to qualify the
calibrations taken. He shall also improve the proficiency with MIDAS.
Operation of the NTT (C)
During nighttime, operate the telescope at maximum efficiency and full
capabilities, while maintaining the security of the people and
equipment.
-he shall get informed about the improvements and changes of the system,
-he shall get the necessary knowledge in order to be able to
troubleshoot the system, during night operation.
-he will assist the astronomers with their observations. During
daytime, he shall operate the NTT system.
-the execution of the calibration/maintenance plan.
-the instrument set-up, and monitoring and cooling of the CCDs,
and the Start-up of the system to get it ready for the night.
Operation from RITZ (C)
Ariel will continue to operate NTT from the RITZ and also he shall
learn how to operate of 2p2 telescope and assist to 2p2 TIO in case of
problems. DIMM/ASM: he shall monitor the automatic work of the
system, and troubleshoot it when needed.
Documentation Officer ISO-9000 compliant (M)
Ariel is the NTT documentation officer. Ariel shall lead the update
of the NTT documentation to the ISO 9000 Standard, and he shall be in
charge of the paper documentation of the NTT, and their electronic
version. He shall attribute document Nrs to new document, he shall
collect the electronic source of the documents, keep and organize them
in the electronic repository. He shall make sure that the printer
versions of all documents presents in the control room are up-to-date.
Ariel shall make NTT documentation ISO-compliant, implement version
control and repository access.
DIMM/ASM coordination (D)
Ariel will coordinate all activities related to the DIMM/ASM (in shift
opposite with the coordinator currently J. Miranda) maintenance and
repair and pass the information to the DIMM/ASM coordinator.
SOFI TIO Deputy (M)
Ariel shall follow-up and track problems related to the SOFI (TIO
deputy), according to LSO/SciOps re-engineering plan
Study/re-engineering SciOps scheme together wit Paranal
(M)) Ariel shall participate on working groups and discussions related
with the theme.
Eric Wenderoth
TIO; Supervisor: J.Miranda, HoTIOa v: 2002-12-20
Operation of the 3p6m (C, all yr)
At night, operate the telescope at maximum efficiency and full
capabilities of the system. At day, perform operation/maintenance/calibration
plan according to procedure, always aiming at maximum performance of the system.
Service Observing at 2p2m telescope Tio (C, all yr)
Erich shall get fully trained in 2p2+ WFI according to LSO/Sciop Re-
engineering plan,to be able to perform service observing at 2p2m.
Instrument Installation and Setup ("C") Erich shall get
fully trained to perform independently the instrumental setups on CES
and EFOSC2. Erich shall be get fully trained to the installation of
EFOSC2 and CES then HARPS adaptor.
Complete ISO9000 implementation(M, all yr) following
recommendation of the audit,related with operation procedures in
Service Observing mode at 2p2m + WFI.
Study/reengineering Scop scheme together with Paranal (M,
all yr) Erich shall participate activelly on working groups and
discussions related with the theme.
TIMMI2 instrument scientist (C) Conplete the upgrade to
VLT-SW control, cmm of the IP. Continuously monitor the instrument
sensitivity in selected imaging modes. Maintain and upgrade the
current TIMMI2 on-line pipeline within the LSO data-flow framework.
Quick Look Tools (C) Develop, implement and document
appropriate tools for VA to enable quick-look of TIMMI2 spectra
(extraction and wavelength calibration) based on DRP within SciSoft
Maintain and upgrade the WEB pages after the T2 upgrade
(Q2), provide a user manual (Q4).(M)
Support astronomer (visiting and service mode) for TIMMI2
and SofI.
To become proficient in supporting SOFI on NTT (C)
to keep supporting EMMI and SUSI on NTT C
to get trained on one of the high resolution spectrographs
available at La Silla (FEROS, HARPS or CES), complete the ongoing
training with the echelle mode on EMMI (C)
to get a deeper understanding of the interplay between instrument
panels and the software underneath, with dedicated shift to training,
if necessary M
Lisa Germany
Fellow; Supervisor: R.Mendez, HoImg v: 2003-01-22
Update Bad-Pixel Mask (& related instructions on web) for
the WFI Mosaic (C, Q1),
Update WFI and Template User Manuals. This task should be
done in close collaboration with the documentation officer
(F. Labragna and M. Martinez) to create the above document in the
proper fromat. (M, Q2)
Continue with implementation/maintenance of the Calib Plan
as started in 2002, unifying methods and procedures as used at other
imaging instruments in La Silla (specially SuSI2). Coordinate the
follow-up & implementation of action items for WFI as decided on the
Calib. Plan Meeting held in 2002. As part of this, implement 'tmag'
for use with WFI data, and web reporting of the results. Document all
aspects of the Calib Plan. (C, all year).
Support Astronomer (C, all yr) Supporting the
visiting/service astronomers (Phase II and Telescope introduction, day
and night time astronomical support, pre- and post-observation
support, Service Mode).
Study/re-engineering SciOps scheme together wit Paranal
(D). Shall participate on working groups and discussions related with
the theme.
Linux PC system maintenance for DRL6 and w2p2drl (M) In
charge of the systems monitoring (maintenance and administration done
by SWC Team). This includes coordinating troubleshooting and upgrades
and, **specially**, enforcing the useage etiquette (software
used/installed, disk space, etc.).
Head of Astronomer Section of SciOp (C, all year)
Prepare, implement and maintain Astronomer's schedule
Assist HoSciOp in managerial duties related to Astronomer Section
Imaging Instrument Force Leader (C, all year)
lead the ls-imaging related Instrument Cores toward the completion
of ESO, La Silla and SciOps Goals.
Complete ISO 9000 implementation, following recommendation of the
audit (M, Q2)
- have the audit recommendations implemented in the LS-Imaging IFo
- have the audit recommendations implemented in the Astro Section
Make SciOp documentation ISO-complient; implement version control
and repository access (M, Q2)
RMe is in charge of this goal for the LS-Imaging IFo
Calibration plan: implement and document CALOB calibration
plan for all VLT-complient instruments (M, Q2): RMe is in
charge of this goal for the LS-Imaging IFo
Implement quick look tools for all instruments (Imaging: seeing and
exposure level; Spectro: 1D extraction and wavelength calibr;
Echelle: "guess-sessions"). Implementation within SciSoft (ideally
Midas). (D, Q4) RMe is in charge of these goals for the LS-Imaging IFo
Zero Points and Sensitivity (M, Q4)
All ls-Imaging instruments must have a uniform, standard procedure
to measure their photometric throughput.
Together with PO, organize a "calibration plan party" to present
the status of the CalPlan (D, Q1)
RMe is in charge of the LS-Imaging contribution.
Operation from RITZ (C, Q1)
RMe is in charge of the coordination of
requirements and of checking their implementation
-for WFI, and
-for the Service Mode operation of the 2p2.
Study/re-engineer SciOp scheme together with Paranal (D, Q4)
RMe, personally, as HoIFo and as HoAstro, shall contribute to this
goal.
WFI Instrument Scientist (C, all yr):
RMe shall be the specialist of WFI operation and
observations. He shall maintain and update its documentation,
define, implement and organize the execution of the calibration
plan.
Support Astronomer (C, all yr)
Supporting the visiting/service astronomers (Phase II and Telescope
introduction, day and night time astronomical support, pre- and
post-observation support)
John Pritchard
OpAstronomer; Supervisor: O.Hainaut, HoSciOp
HiRes Instrument Force Leader (C, all year)
lead and oversee the ls-HiRes related Instrument Cores toward the
completion of ESO, La Silla and SciOps Goals. Report activities.
FEROS BigBang (C, Q2):
Upgrade FEROS to full VLT complience (control and operation
software, from front end to back end).
ls-HiRes is in charge of the scientific and operational aspects of
this project
FEROS ADC installation (D, Q2)
Install an Atmospheric Dispersion Corrector on FEROS:
ls-HiRes is in charge of the scientific and operational aspects of
this project
HARPS installation and commissioning, then operation (C, Q3)
ls-HiRes is in charge of the scientific and operational aspects of
this project, including acceptance of the instrument on behalf of SciOp
CES Polarimetric mode (D, Q4)
Investigate, report and if possible, implement a polarimetric mode
for CES.
Organize and supervize the moth-balling of 1.52m telescope (M, Q1)
Complete ISO 9000 implementation, following recommendation of the
audit (M, Q1):
Have the audit recommendations implemented in the LS-HiResIFo
Make SciOp documentation ISO-complient; implement version control
and repository access (M, Q2):
JPr is in charge of this goal for the LS-HiRes IFo
Calibration plan: implement and document CALOB calibration plan for
all VLT-complient instruments (M, Q2):
JPr is in charge of this goal for the LS-Hires IFo
Implement quick look tools for all instruments (Imaging: seeing and
exposure level; Spectro: 1D extraction and wavelength calibr;
Echelle: "guess-sessions"). Implementation within SciSoft (ideally
Midas). (M, Q3)
JPr is in charge of these goals for the LS-HiRes IFo.
In the case of FEROS, this translate in having the pipeline up and
running in the 2p2 environment, and to ensure it is maintainable
(conf. ctrl, documentation, etc).
Implement ZeroPt and sensitivity monitoring (M, Q4)
All ls-HiRes instruments should have a set of procedures
(implemented in SciSoft) to measure their throughputs in standard modes.
Together with PO, organize a "calibration plan party" to present
the status of the CalPlan. (D, Q1)
JPr is in charge of the LS-HiRes contribution.
Operation from RITZ: (C, Q1)
JPr is in charge of the coordination of requirements and of
checking their implementation for ls-HiRes instruments
Study/re-engineer SciOp scheme together with Paranal (D, Q4)
JPr, personally and as HoIFo shall contribute to this goal.
Support Astronomer (C, all yr)
Supporting the visiting/service astronomers (Phase II and Telescope
introduction, day and night time astronomical support, pre- and
post-observation support)
Emanuela Pompei
Astronomer; Supervisor: O.Hainaut
Spectroscopy Instrument Force Leader (C, all year)
lead the ls-imaging related Instrument Cores toward the completion
of ESO, La Silla and SciOps Goals.
Complete ISO 9000 implementation, following recommendation of the
audit (M, Q2)
EPo shall have the audit recommendations implemented in the LS-Spectro IFo
Make SciOp documentation ISO-complient; implement version control
and repository access (M, Q2)
EPo is in charge of this goal for the LS-Spectro IFo
Calibration plan: implement and document CALOB calibration plan for
all VLT-complient instruments (M, Q2):
EPo is in charge of this goal for the LS-Spectro IFo.
Implement quick look tools for all instruments (Imaging: seeing and
exposure level; Spectro: 1D extraction and wavelength calibr;
Echelle: "guess-sessions"). Implementation within SciSoft (ideally
Midas). (D, Q4)
EPo is in charge of these goals for the LS-Spectro IFo
Zero Points and Sensitivity (M, Q4)
All ls-Spectro instruments must have a uniform, standard procedure
to measure their throughput.
Together with PO, organize a "calibration plan party" to present
the status of the CalPlan (D, Q1)
EPo is in charge of the LS-Spectro contribution.
Operation from RITZ (C, Q1)
EPo is in charge of the coordination of
requirements and of checking their implementation for EFOSC.
Study/re-engineer SciOp scheme together with Paranal (D, Q4)
EPo, personally and as LS-Speectro IFo, shall contribute to this
goal.
EMMI Instrument Scientist (C, all yr):
EPo shall be the specialist of EMMI operation and
observations. She shall maintain and update its documentation,
define, implement and organize the execution of the calibration
plan, and of the maintenance plan (with OpEng).
Support Astronomer (C, all yr)
Supporting the visiting/service astronomers (Phase II and Telescope
introduction, day and night time astronomical support, pre- and
post-observation support)
Ivo Saviane
Fellow; Supervisor: J.Pritchard, HoHiRes
Linda Schmidtobreick
Fellow; Supervisor: R.Mendez, HoImg v: 2003-01-19
Monitoring Telescope Image Quality (M, all year)
Enforce and monitor image quality measurements at the MPI 2.2m
telescope,
Filter characterization and maintenance in web pages (including
transmission curves and optical quality of filters), in WFI filter
wheel, and in the DFS+OS databases, including strict and precise
configuration control procedures and methodologies for filters mounted
on WFI. Coordinate (with Gilliote) the regular monitoring/cleaning of
WFI filters.
Implement and actively follow-up on action items for 2p2/WFI from
IQ meeting held in 2002.
Determine fringing pattern for the WFI (new)I and R
filters, in coordination with M. Billeres (SuSI2) (M, Q2).
Write a Cookboook on basic WFI data reduction using MIDAS,
including Bias & FF correction (Dome vs. Sky, Illumination correction,
case of Narrow band filters), full Mosaic re-composition and gap
filling, and astrometric solution. Place it on web (M, Q2).
Create RDT-plugins for quick data quality control at the telescope
including:
Average seeing over the Mosaic (in arcsec),
Average image shape (ellipticity, position angle),
Mean background level (ADU) over a region,
Exposure level for a given object (peak intensity above
background, overall S/N, shape).
Implement at WFI/2p2 first (C, Q2), explode to
SuSI2, EFOSC and EMMI
afterwards (C, Q4).
Refine the 'Guide to Service Observing' with the goal of serving
as a Service Mode training document for TIOs (M, Q2), with active
input from Erich Wenderoth (SM TIO@2p2).
Support Astronomer (C, all yr) Supporting the
visiting/service astronomers (Phase II and Telescope introduction, day
and night time astronomical support, pre- and post-observation
support, Service Mode).
Study/re-engineering SciOps scheme together wit Paranal
(D). Shall participate on working groups and discussions related with
the theme.
Zero Point variation across Mosaic (C, Q2). Implement
regular measurements and computation+(web)display of Mosaic throughput
(relative) variations in Standard Filters. Document procedures and
software (for local as well as external consumption).
Maintain/improve other aspects of the Calib Plan currently under his
responsability (see web page), including CCD Bias Levels, Gains,
Read-Noises (Daily Health Check), Shutter and Linearity Errors, CCD
Transfer Function, Sensitivity to Beta-light, CCD Bias, Gain and RON
(Weekly Health Check), Sky Concentration.
Tune-up and improve WFI CCDs linearity, in collaboration with La
Silla's ODT group (M, Q2),
Participate in the 2p2 VLT Software Upgrade, providing support in
the scientific aspects of the Obs. Templates (e.g., improvement for
better efficiency, debugging) (C, Q3).
Write a Cookboook on basic WFI data reduction using IRAF,
including Bias & FF correction (Dome vs. Sky, Illumination correction,
case of Narrow band filters), full Mosaic re-composition and gap
filling, astrometric solution, and basic photometric solution (can
follow document prepeared by H. Jones). Place it on web (M, Q2).
Finish and deliver 2p2 Configuration Control Packages
(wfotm, e2p2opse2p2met, Daily & Weekly HC) and support Libraries (if
any) to SciOp Engineers (Conf. Control Managers)(C, Q1),
Support Astronomer (C, all yr) Supporting the
visiting/service astronomers (Phase II and Telescope introduction, day
and night time astronomical support, pre- and post-observation
support, Service Mode).
Study/re-engineering SciOps scheme together with Paranal
(D). Shall participate on working groups and discussions related with
the theme.
Sudy IQ data to improve undertanding of focus behavior
vs. various variables. Implement new formula on templates (M, Q2).
Deputy to HoSciOp (C) Assist HoSciOp in his managerial
duties, replace him when need arises
SciOp Management: (M) EBa is in manager of the WorkPackages
"SciOp operation" and "Telescope maintenance", and deputy to the WPMgr
of some other WPs
Operation Engineer: (C) Together with PLs, organize and
supervize daily operation at 3.6, 2.2 and NTT: 1 -
develop/implement/maintain operation procedures, checklists,
troubleshooting lists 2 - prepare VLTSW upgrades 3 - stat.process
control implementation and analysis.
ISO9000 audit (M)
complete ISO 9000 implementation, following recommendation of
audit. EBa is in charge of the implementation of the
recommendations related to 3p6 and 2p2 operation
ISO9000: Documentation (M) make SciOp's documentation
ISO-compliant. Implement version control and repository access. EBa's
responsibility is to guide & supervise the Doc.Technician that will be
hired.
ISO9000: CalPlan CALOB (D)
assist the Instrument Scientists in the implementation of the CALOB
calibration plan system.
Cal.Plan "party" (D)
A calibration plan meeting will be held together with Paranal
SciOp. EBa shall present the results of the Statistical Process
Control for the 3p6 instruments
a- Instrumentation: TIMMI2 upgrade (C) EBa is in charge of
defining and implementing the dayly operation of T2; for astronomical
aspects and constraints, he shall be assisted by the T2
instr. Scientist
Instrumentation: HARPS (C)
Together with the HARPS consortium and HARPS instrument scientist:
define and implement daily operation of the HARPS system, including
instrument change-over.
3.6m M2 project (M)
EBa shall act as main interface with LED for the completion of this
project. He shall also define and implement the Image Quality
monitoring and opertion of the pseudo-active optics.
Remote operation from RITZ (C) EBa is in charge of the
coordination of the move of the 3p6 with LED; of the implementation of
the remote monitoring system.