General Description
- This is an imaging run of the debris disk star HD141891 in the N and
Q bands, using SIC and Q2 filters. Note that acquisition should be done in K (see
Special Execution requirements).
- Appropriate period for observing HD141891 in optimal conditions is the second-half
of March.
- We request standard calibration for this run to be used also as PSF-reference
images.
Waiver Requests
Critical Observing Condition Constraints
For this imaging run, we necessitate high angular resolution:
1) Thus we need to be diffracion-limited at 10 microns, which occurs with a seeing
of 0.8" in the optical.
2) Since we image faint structure, we necessitate optimal atmospheric conditions
(photometric) in order to have minimum flux losses.
Time-Critical Aspects
For our science, we necessitate to be close to the diffraction limit in
the N band. Thus, we requested lowest possible airmasses. For HD141891, we wish
to have observations below 1.3 airmass (which happens during 1h40min) or 1.4 airmass
(which happens during 4h20min) at periods indicated in Time Intervals, with a preference
towards end of March.
Special Execution Requirements
According to IPAC catalog (http://nsted.ipac.caltech.edu), HD141891 and
IRAS-15507-6316 are the same target with fluxes N~6 Jy and Q~1.6 Jy, with indication
of being "slightly contaminated by companions".
At the contrary, according to SIMBAD HD141891 and IRAS-15507-6316 are different
targets distant by 9".
In order to solve this indetermination, we suggest to precisely acquire the source
in the K-band, where HD141891 appears as the brighter source in the field (see 2-MASS
Finding Chart, and K~2.1), then to switch to the SIC filter once the acquisition
is done.
Also, in order to perform appropriate centering of the 20 mu image on the 10 mu
image at the pointing accuracy of the telescope during the data reduction phase,
it is mandatory that 20 mu images are done immediately after the 10 mu images. N
band and Q band imaging must not be separated in time.
Special Calibration Information
For this run, we use as a PSF-reference star:
- We need to have the star HD151249 observed at similar airmass than the science
target, which occurs directly AFTER the science observation. We submitted a corresponding
calibration OB.
- HD151249 brightness is N~34 Jy and Q~13 Jy.
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If the provided finding chart is at a different wavelength than the observations,
did you clearly describe in the README file how to identify the target?
Did you specify a guide star brighter than V=12mag within a field of
r=5arcmin around the science target?