README web version of /home/usg/OPS/MTS/readme_xml/readme_84110601
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a ToO program to target the first bright new comet (mv=6.0) that
will be observed by the Herschel IR space telescope (one target). Three VLT spectrometers
will be used : UVES on UT2 and CRIRES and FORS2 on UT1. The observations will be
trigered at the same time for the three instruments to be executed as close as possible
(the same night is best or within a few days) to the Herschel observations.
This README is for the FORS2 run (B) that was allocated 1.5h.
There are 3 idendical science OBs, using LSS slit of 1.0" and Grism 300V (none).
The goal of these OBs is to take a few short exposures on the nucleus of the comet
and one long exposure several arcminutes away.
The exptimes and offsets are indicative, the final informations (exptime, slit PA,
etc.) will be provided at the time of the trigger.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
The detailed observing strategy (exptime, PA, offset for the long exposure
etc.) is depending on the target and will be provided during the ToO trigger.
Please note :
------------
- There are 3 identical OBs using LSS 1.0", GRISM 300V(none). Each OB contains 2
shorts exposures on nucleus and 1 long far from the nucleus (offset of 15 arcmin)
- A 60 arcsec offset is applied along Y to the first exposure to put the false nucleus
far from the CCD gap
- A fixed position of the slit on the sky will be used (PA will be provided during
trigger),
- 3 OBs have been provided to execute them on the same night as the CRIRES observations
(which will mostly be split on 2 or 3 different nights).
- The coordinates *and* the differential tracking rates have to be updated in the
OBs before the 1rst execution. 5 min step ephemeris will be provided at the time
of the trigger. The position angle (PA) will also be given to be updated in the
acquisition template.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:33 2009
If you have comments, please contact usd-help@eso.org