README web version of /home/usg/OPS/MTS/readme_xml/readme_84093401
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program is to acquire new positions and colors for both components
of four different large separation (separation of 1.3\"-3.0\") TNO binaries. There
are two kinds of OBs.
The photometric OBs (named MOV_-col) are meant to determine the
relative colors of each component. They contain a sequence RVRIR, which lasts 0.9
hr. There is 1 photometric OB in this run.
The astrometric OBs (named MOV_-ast-[1|2]) are designed to measure
the relative position of the components of the binaries, with a base line long enough
to ensure the proper detection of the TNOs. They contain a sequence RVR, for 0.5
hr. There are 6 astrometric OBs in this run.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:32 2009
If you have comments, please contact usd-help@eso.org