README web version of /home/usg/OPS/MTS/readme_xml/readme_84093200
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a simple run in which we plan to obtain high-resolution spectroscopic
data with the standard DIC-1 390+580 setting. All OD's and CS are identical.
We plan to observe nine targets with a S/N > 100. Since these objects are rather
faint, this requires exposure times of more than one hour and we therefore splitted
each observation in as few identical observation blocks as possible.
Please try to complete any given source before going on to the next. Each target
has it's own priority level.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:32 2009
If you have comments, please contact usd-help@eso.org