README web version of /home/usg/OPS/MTS/readme_xml/readme_84079900
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The project concerns SNe, which at the time of discovery may have V=16.
Each SN will be observed 3-5 times, spread over 2-4 weeks. More often and over
a longer period of time if an SN is very bright.
The aimed-for accuracy is 0.1% in the degree of polarization.
We provide OBs for SNe and spectrophotometric standards. They come in 2 flavors,
namely with and without order-sorting filter. For any given set of observations,
SN and standard must be observed with the same flavor. The triggering message will
provide the advice, which one to use.
All exposure times in the OBs are just dummy numbers. They need to be replaced
at the time of the execution.
Finding charts will be submitted at the respective first trigger.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
It will help if the respective first observation can be made within 2
days of the request. The observations will be typically reduced within 24 hours
of receipt of the data to decide about follow-up observations. For these, the requested
response time will be 2-4 days.
We will try to avoiud making too extensive use of the granted waiver of the 1-hour
restriction on the OB execution time. Rather, we may ask to execute two OBs within
the same or at most the following night.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:32 2009
If you have comments, please contact usd-help@eso.org