This is the TOO part of our NACO+VISIR monitoring programme of the T Tau
system,
aimed particularly at characterizing the (sometimes very fast) photometric variations
in Sa, the more massive component of the southern close binary. For a more detailed
description, see the readme of the main monitoring programme (084.C-0783(A+B)).
Here we list only information specific to the TOO part.
The normal monitoring programme consists of "monthly" observations during the whole
of
P84, and "weekly" observations during two months (preferably november+december).
The
TOO will be triggered in case substantial variations from one week to the next are
detected in the weekly monitoring period. The TOO comprises even more intensive
monitoring, with one observation every 1-2 days (do whatever is feasible on the
mountain, and "every day" is not necessarily better than "every two days". A mixture
of 1 and 2 day intervals would be ideal).
Though direct interaction with PI's is not part of standard procedures, we would
greatly appreciate it if you could send us (boekel@mpia.de, ratzka@usm.uni-muenchen.de)
a quick email saying "we observed T Tau last night with NACO (VISIR)", in case you
did.
many thanks for your help, we hope you'll have fun executing this programme, and
that we will detect some nice and fast variations - those are the ones from which
we learn most!
with best regards, on behalf of the team
Roy van Boekel
Thorsten Ratzka
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
During the optional, intensive monitoring part of the campaign (i.e. this
TOO programme),
it is important that the NACO and VISIR observations are done during the same night,
if at all possible, since we seek to characterize SED variations on time scales
of days.
Special Execution Requirements
Special Calibration Information
ToO Information
The TOO part consists of observations identical to those in the main monitoring
programme, except that the frequency of execution is increased to once every
1-2 days (a mixture of 1 and 2 day intervals is ideal).
For the TOO observations, it is important that the NACO and VISIR observations
are performed during the same night, whenever possible.
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have PSF reference star OBs, do the names of those OBs begin with
PSF_ ?
If there are Finding Charts attached to your OBs, is the field-of-view
of at least one of these charts 2' x 2' (with clearly labelled field orientation)
?
Have you clearly marked and labelled your wavefront reference objects
R1, R2, R3, ... (as specified in the NAOS Preparation Software) on your Finding
Charts ?
Have you specified the magnitude of the brightest object in the field-of-view
for each OB ?
Are there objects in any of your fields (including standard stars) which
are brighter than the limits specified in the User Manual and on NACO web Pages
?
If the previous answer is yes, have you given a list of OBs and a justification
for the brightness limit violation in the general description field ?
Last creation of page: Tue Oct 6 15:40:32 2009
If you have comments, please contact usd-help@eso.org