README web version of /home/usg/OPS/MTS/readme_xml/readme_84020701
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Aim: In this run (runB), we need to record saturated images of beta Pictoris
(herefater Bpic) and saturated images of a PSF star (also called comparison star,
as in the proposal) (HR2435). We will also record unsaturated images of both stars,
which will be used as PSF and photometric references).
Each OB consists of:
- an acquisition template
- 1 science template to get unsaturated images (using the NDL filter) at different
offsets
- 3 science templates to get saturated images at different offsets
The run will execute successively :
- the Bpic OB (Bpic_Lp_runB)
- the PSF OB (PSF_Bpic_Lp_runB)
Each OB will be executed in 44 minutes each (see below).
*Please, mind the time-critical/execution constraints below*
Waiver Requests
Waiver requests have been sent :
- to ask to be allowed to observe beta pic and hr2435 whch are brighter than 5 at
L'.
- to ask to execute the PSF OB immediately after the OB of the science target, bpic.
- to ask to prepare OBs with durations as estimated by p2pp longer than what is
allocated, but with ACTUAL
execution times (44-45 minutes) meeting the time allocation (see REDAME file); this
is to take into account the discrepancy mainly between the estimated acquisition
times and the actual acquisition times.
All these items were accepted.
Critical Observing Condition Constraints
Time-Critical Aspects
There are time-critical/execution constraints associated to these observations:
0- As mentionned in the proposal, runB sould be executed in the period Nov-Dec20.
1- In order to avoid the spiders beeing too close to the Bpic disk PA (30 deg) during
the exposures, we need to start the Bpic OB between 90 and 30 minutes prior to the
meridian, ie at LST in the range 04h17--05h17. (We recall that the run then lasts
1h30).
2- Bpic and the PSF should be observed at identical parallactic angles. To do so,
the Bpic OB should be executed in 45 minutes. In order to take into account the
uncertainty in the duration of the acquisition process, the OBs as prepared last
more than 45 minutes (this was done after acceptation of a WR). We ask the Astronomer
to STOP the OB 44-45 minutes after starting the beta Pic OB and proceed immediately
with the PSF OB. The PSF OB should last 44-45 minutes as well. Hence the total run
time will be 2*45 minutes.
Note that depending on the actual durations of acquisition and overheads, we are
aware that the last template of each OB may or may not be completely executed or
even started.
3- Please avoid any delay between acquisition and science frames.
Special Execution Requirements
Important notes:
- finding charts: in both cases, the brightest objects in the FoV will be the targets
themselves.
- both targets will be used as a reference for AO
- in all cases, the offset patterns assume that the targets are centered in the
FoV at the beginning of the template (ie prior to the first offset)
- the DITs of the unsaturated images (using the NDL filter) have been calculated
using the ETC; they are supposed to avoid the non linearity domain (and it was the
case in previous runs). If the level of non linearity is reached at acquisition,
please adjust the DIT so as to avoid this non linearity domain (we are aware nevertheless
of the 0.175s limit for the mininum DIT).
- the DITs of the saturated images of bpic have been defined to saturate the core
of the PSF over a radius of 4 to 5 pixels (and it was the case in previous runs).
Please adjust the DIT according to the actual observing conditions at the beginning
of each template.
- same for the PSF.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have PSF reference star OBs, do the names of those OBs begin with
PSF_ ?
If there are Finding Charts attached to your OBs, is the field-of-view
of at least one of these charts 2' x 2' (with clearly labelled field orientation)
?
Have you clearly marked and labelled your wavefront reference objects
R1, R2, R3, ... (as specified in the NAOS Preparation Software) on your Finding
Charts ?
Have you specified the magnitude of the brightest object in the field-of-view
for each OB ?
Are there objects in any of your fields (including standard stars) which
are brighter than the limits specified in the User Manual and on NACO web Pages
?
If the previous answer is yes, have you given a list of OBs and a justification
for the brightness limit violation in the general description field ?
Last creation of page: Tue Oct 6 15:40:31 2009
If you have comments, please contact usd-help@eso.org