README web version of /home/usg/OPS/MTS/readme_xml/readme_84011500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Fast IPOL of a moving target. The target is a faint comet, that most likely
will not exhibit activity (coma). Please take care of entering the right coordinates
and the additional tracking velocity according to the ephemeris file provided.
The aim of this programme is to sample its orbit from phase angle 18 to about 3.
The OBs are therefore named according to the best time intervals in which they should
be executed. However, it an observing window is missed, the corresponding OB can
be executed at any other time.
We have relaxed the seeing conditions from 0.8" (as requested in the proposal) to
1.0". It would be highly desirable not to further exceed this limit.
no finding charts are provided, because this is a moving target.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The OBs should be executed within three time window clearly indicated
in the OB names, but if a time window is missed, the corresponding OB can be executed
at another time.
The following dates should be preferentially avoided, due to the presence of strong
background objects.
2010-01-02
2010-01-07
2010-01-13 after UT=08:00
2010-01-18
2010-01-20
2010-01-29
2010-02-12 after UT=06:00
2010-02-15
2010-02-15
2010-02-23
2010-02-24
2010-02-25
2010-02-26
2010-02-28
2010-03-02
2010-03-04 before UT=04:30
2010-03-10
2010-03-11
2010-03-12 after UT=04:30
2010-03-14
2010-03-17
2010-03-21 before UT=03:00
2010-03-23 before UT=06:00
2010-03-24 after UT=08:00
2010-03-25 before UT=06:00
2010-03-26
2010-03-28
2010-03-29
Special Execution Requirements
This is a moving targets. RA and DEC, as well as differential tracking,
must be entered manually accoding to the ephemeris file.
If OB execution is interrupted for any reason, and cannot be resumed immediately
or within a few minutes, then the entire OB must re-executed.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:31 2009
If you have comments, please contact usd-help@eso.org