This is an MOS spectroscopy run. There are 9 pointings, tiling the UKIDSS-UDS
field. The observations in each pointing are split into either 2 or 3 OBs (_1, _2,
_3 in the names), summing to a total of approximately 100 minutes on-sky in each
case. The splitting into 2 and 3 OBs has been done to give a variety of different
OB executation times to assist in scheduling the project. Longer OBs have been allocated
higher priority so that these are observed where possible, instead of more easily
schedulable shorter OBs. The longest OBs go slightly beyond the 1 hour limit, and
a waiver has been obtained for these.
The primary targets on the masks are objects selected as narrow-band emitters in
our near-IR narrow-band project. They are thus emission line objects. The aim of
the project is to confirm the redshifts. Many objects are optically faint: *most
will not be visible in the through-slit image* but there should be enough detections
to allow centering. Continuum detections in the spectra may also be weak or absent
- but the aim is to detect the emission lines and measure the redshift from these.
A significant fraction of the emitters are expected to have an emission line at
around 6840Ang, whilst others will have an emission line at around 3930 Ang. Many
of these emission lines may be weak and only reliably detected when the different
observations are all combined.
These observations use the LR-Blue grism but do not use an order-sorting filter.
That is deliberate, in order to give the required wavelength coverage. Since the
focus is on emission lines, the second-order effects caused by the lack of order-sorting
filter are not important. A night-time arc observation is included in each OB as
required for this grism choice. No night-time flats are included: the spectra are
dithered along the slit to minimise flat-fielding errors.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:31 2009
If you have comments, please contact usd-help@eso.org