README web version of /home/usg/OPS/MTS/readme_xml/readme_83088000
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Three colour imaging of a 3/4 square degree area centered on a claimed
supercluster at z=0.5. All images are tagged as pre-images as they are all necessary
to derive the photometric colour-selected sample of objects to be spectroscopically
observed in the "B" run. Standard imaging calibrations are required nevertheless
as we need to photometrically calibrate the data. The idea is to identify four regions
with clusters at the claimed redshift of the supercluster and verify concordent
redshifts to confirm the claim of a supercluster. Imaging is in 18 OBs, two 3 by
3 grids of pointings, one staggered by 2 arminutes in RA & DEC from the other
to cover most of the chip gaps. Although this gives small unobserved holes covering
a few percent of the area, this is the most efficient use of the observing time.
Waiver Requests
083.A-0880A.01.WAV Approved: Allows V& I imaging to be done as pre-imaging.This
was done to ensure all bands are delivered quickly so a photometric colour selected
catalog can be prepped to set up the masks in run B. In addition to the V &
I bands, the OBs contain R band preimages, which I will align the masks to (as
standard).
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Standard imaging calibs required for VR&I even though the images are
tagged as pre-imaging. We need to make a photometric catalogue in order to select
objexcts for spectroscopy in run B. So bias, flats and standard/zeropoint reqiired
for each band.
The 9 "a" pointings are tagged as higher priority as the "b" pointings only so that
all "a" pointings are completed before the "b" ones are begun. That should help
us make the catalogues for the entire area more quickly as we have a representative
sample of data more quickly tha if "a" and "b" pointings were observed together.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
All imaging tagged as preimaging, but all needs to be reduced as standard
photometry, so standard calibs are also required. The two three-by-three pointing
grids are given different priorities to ensure one is completed before the other
is started in order to speed creation of the input catalogue for spectroscopy.
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:30 2009