README web version of /home/usg/OPS/MTS/readme_xml/readme_83082100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The aim of this project is to confirm a very promising transiting planet
candidate, POTS-C1, using high precision RV measurements. In addition, two less
reliable candidates (POTS-C3 and POTS-C4) and a few eclipsing binaries are being
followed-up with UVES/FLAMES in 7+1 fibre mode. Simultaneously, we use MEDUSA to
take a large number of low resolution spectra (two regions) of selected stars in
the FOV. The execution time of one OB is exactly 1h. There are some time critical
aspects for the execution (see below).
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Since measurements close to the transit and secondary trasit are at almost
zero RV, the information we get from these measurements is very low. The OBs should
preferebly be executed close to 0.25 or 0.75 orbital phases, and therefore wihtin
the following observational windows:
night start end
03/04.08.2009 23:36:57 02:07:58
06/07.08.2009 23:37:57 01:56:11
09/10.08.2009 23:38:55 01:44:23
12/13.08.2009 23:39:53 01:32:36
15/16.08.2009 23:40:51 01:20:48
22/23.08.2009 23:41:48 01:09:00
25/26.08.2009 23:42:45 00:59:14
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify in your OBs the hour angle range for which your Target
Setup files are valid ?
Did you specify in your OBs the magnitudes of FACBs and Guide Star for
all your fields ?
Are the FACBs and Guide Star in the brightness ranges specified in the
FLAMES manual ?
Did you enter the expected signal to noise in your OBs ?
Last creation of page: Tue Oct 6 15:40:30 2009
If you have comments, please contact usd-help@eso.org