README web version of /home/usg/OPS/MTS/readme_xml/readme_83082001
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
These are OBs for MOS spectroscopic observations of very high redshift
candidates at z>6.5. The OBs consist of acquisition, through-slit positioning
and of science exposures with small offsets along the slits.
The high redshift targets are in the slitlets #5-#8, and we hope to detect their
LyAlpha emission line. However, they are too faint for a detection of their continuum.
We assigned a total of 4 relatively bright stars (i_AB = 18.4 - 20.5) for the through-slit
positioning. These are namely positioned in the slitlets #3, #4, #9, and #14. The
through-slit images should be aligned to center these objects only.
In order to increase the possibility for scheduling our observations, we lessened
the seeing constraint to 0.8".
Waiver Requests
083.A-0820B.01.WAV
Submitted: Friday, Aug. 18, 2009
Approved: Tuesday, Sep. 1, 2009
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:30 2009
If you have comments, please contact usd-help@eso.org