README web version of /home/usg/OPS/MTS/readme_xml/readme_83068800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
We aim at observing verified members of the red giant branch (RGB) in
the Hercules dwarf spheroidal galaxy to get enough S/N to compute chemical abundaces.
A number of (brighter) foreground stars are also to be observed with GIRAFFE. 25
sky positions have been allocated to the GIRAFFE fibres.
Coordinates for all our targets are from the Sloan Digital Sky Survey (SDSS). These
coordinates have been compared with those derived from our own imagaing with the
INT on La Palma and also, for the brighter targets, with 2MASS coordinates. Over
our whole field of view these three sets of coordinates agree very well and the
differences are always smaller than the requested accuracy for FLAMES (ie less than
0.3 arcsec). Also the guide star and the four FACBs are on this system.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify in your OBs the hour angle range for which your Target
Setup files are valid ?
Did you specify in your OBs the magnitudes of FACBs and Guide Star for
all your fields ?
Are the FACBs and Guide Star in the brightness ranges specified in the
FLAMES manual ?
Did you enter the expected signal to noise in your OBs ?
Last creation of page: Tue Oct 6 15:40:30 2009
If you have comments, please contact usd-help@eso.org