README web version of /home/usg/OPS/MTS/readme_xml/readme_83064300
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a spectroscopic run for only one target (binary brown dwarf) with
the 0.3" longslit. The binary system has unresolved magnitudes of R=19.2 and I=16.8
and the two components are separated by ~0.38". To be able to resolve the individual
spectra we will need superb seeing conditions (<=0.4").
To achieve the required dispersion we use the non-standard 100kHz,1x1,high read-out
mode together with the high-resolution collimator COLL_HR+7.
Acquisition:
------------
To fit both Kelu-1 components in the slit, the rotator on sky has to be -42.9 degrees!
It is very important, and thus PLEASE make sure, that both! binary components stay
in the slit during the whole observation!!!!!
We provide 3 Finding Charts (including a 2'x2' and a magnified one) for the science
OBs with all relevant coordinates and the rotator (=slit) orientation.
OBSERVATION:
------------
This run consists of two different spectroscopic science OBs for which we use the
1200R+93 grism with the GG435+81 filter and the 1028z+29 grism with the OG590+32
filter, respectively.
For the corresponding telluric standard OBs we chose HD121847 with spectral type
B8V and R=5.24.
Since we use the non-standard read-out mode, please execute the necessary daytime
callibrations after each of the science OBs!!!
PLEASE be also aware about the special calibration information for this run!!!
(As described therein)
THANK you very much for your support concerning all the different issues of this
run!!!!
Waiver Requests
waiver request with WaiverID 383.C-0643(A)
for an instrument setup change: collimator: COLL_HR+7 together with the MIT CCD
setup: 100kHz,1x1,high
for the science OB (Kelu1) and its corresponding calibrator OBs
was submitted January 23rd 2009 at 5:31 pm
and approved January 23rd 2009 at 10:19 pm
waiver request with WaiverID 383.C-0643(A)
for the science OB Kelu1 R_spectroscopy for a total execution time of 1:34:25 h
was submitted January 29th 2009 at 11:50 am
and approved on January 31st 2009 at 2:40 pm
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
We added two calibration OBs corresponding to the science OBs:
CAL_telluric_standard R_spec and CAL_telluric_standard z_spec, respectively, to
be able to perform telluric correction during data reduction. We chose the standart
HD121847 (B8V) with R=5.24.
Please execute these OBs right after their corresponding science OB. Please be aware
that the slit orientation has to be the same as for the science OB (as indicated
in the OB).
If possible, please place the telluric standart at the same position on the science
detector as Kelu1 (=science target) in the OB before. This will ease any necessary
correction of the science data.
If it turns out to be necessary to change the telluric standard, a range between
B4-A0 will be acceptable. Nevertheless it is very important!!!! to observe at nearly
the same airmass as the science object.
Since we use a non-standard intrument setup with the COLL_HR+7 and the 100kHz,1x1,high
read-out mode, please perform daytime calibrations for domeflats and arcs in this
special mode and the corresponding grism, the morning after each of the science
OBs has been observed!!!
Thank you for your cooperation!
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:30 2009
If you have comments, please contact usd-help@eso.org