The goal of this first Neptune observing run in period 083 is to image
Neptune's atmosphere in PAH1, 7.9, NEII-1 filters (3.5 hours), and then repeating
the same observations six hours later (if airmass and weather permit) when Neptune
has rotated by 180 degrees to characterise the opposite hemisphere. The goal is
to search for spatial variability and rotation, particularly in the polar region.
Our primary requirement is good signal to noise, so please extend integration times
(where overheads have been overestimated) to fill the available seven hours.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
To maximise possible observing time (and to allow sufficient time before
execution of 083.C-0163(B)), these observations should be executed in August 2009.
For a particular hemisphere, it would be best if all three filters were acquired
sequentially.
The goal for the second imaging set is to observe the opposite hemisphere of Neptune,
when the planet has rotated by 180 deg. in longitude. This corresponds to ~6 h
at our latitude of interest. This is best accomplished by observing the intial
imaging sequence in the early evening and repeating 6 hours later in the morning.
If it is not possible to observe 6 h later, please, be ensure that the second observation
observes the opposite side of Neptune. This can be done on the successive night,
i.e. 24h later, PLUS or MINUS a 6-hour delay, e.g. an initial observation made at
0400 local time can be repeated on the next night at 2200; an initial observation
made at 2100 local time can be repeated at 0300 the following night (i.e. 30 hours
later) if weather or other problems prevent a repeat with a short 6-hour delay.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If the provided finding chart is at a different wavelength than the observations,
did you clearly describe in the README file how to identify the target?
Did you specify a guide star brighter than V=12mag within a field of
r=5arcmin around the science target?