README web version of /home/usg/OPS/MTS/readme_xml/readme_83009502
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a monitoring of a single star, suspected to be an almost critically
rotating, yet magnetic star.
Run C OBs should be executed in September
Goal is a) fill the phase diagram b) confirm period of 0.56 days and long term stability
of period, and c) determine eventual secular changes in circumstellar material.
No need to stick to a special timing, but the OBs should not be executed immediately
one after the other in order to give the stellar spectrum some time to change. Minimum
waiting time between two subsequent OBs is 3 hours.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:28 2009
If you have comments, please contact usd-help@eso.org