README web version of /home/usg/OPS/MTS/readme_xml/readme_82507101
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
3C 273 is at MIDI's limits but we have successfully tracked fringes for
this sources several times already, so it is possible. In this programme we mainly
want to repeat the two existing uv points with higher S/N and better calibration
to check our previous (very noisy) observations. We are also taking one additional
uv point at a longer baseline to better constrain our models.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
- Please start with the calibrator HD 107328 and take acquisition images
also for the calibrator (we need that for the data integrity checks of weak sources)
- Then start with the acquisition of 3C 273: Take 24000 Frames for the acquisition
images in order to identify the source.
- Please ensure that the beam overlap is good to within about 1 px (the red / green
crosses) before proceeding
- Please set chopping to 1.3 Hz and start the fringe search
- If the fringe was found and tracked succesfully, please repeat the fringe track
manually (without taking photometry in order to not loose time moving the shutters)
- If all went well, take the photometry and repeat it manually if everything worked
- If there is time left, please go back to the calibrator HD 107328, make sure to
take acquisition images
Further remarks:
- If there are difficulties, please go back to taking acquisition images to ensure
good beam overlap (see above) and / or do another fringe search to ensure that you
are tracking at the correct position (are there any known glitches at the current
delay line positions?)
- For us, baselines UT1-2 and UT2-3 are interchangeable if scheduling should make
this necessary.
- The finding chart is from our previous observations (081B-0092(A)). It has not
changed since then.
- We have included an OB for a backup calibrator (HD 108985)
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate for each science star OB the corresponding calibrator
star OB (and vice versa) in the 'Instrument Comments' field ?
Did you check that your chosen calibrator is bright enough for the instrument
mode used ?
If you use calibrator stars which are not in the CalVin database, did
you specify their characteristics in the README file and in the OBs ?
Did you verify that your coordinates are as accurate as possible (2Mass
coordinates recommended) and that they include proper motions if available ?
Did you specify the LST range of the calibrators such that they cover
the range from 30 min before the start of the LST range of the science target to
30 min after the end of the LST range of the science target ?
Last creation of page: Tue Oct 6 15:40:28 2009
If you have comments, please contact usd-help@eso.org