README web version of /home/usg/OPS/MTS/readme_xml/readme_82505501
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Spectroscopic monitoring of a recurrent nova in the LMC: last 3 epochs.
Observations should be performed in CLR sky and decent seeing (up to 1").
Virtually 2 OB has to be executed at each epoch (DIC1=346+580 and DIC2=437+760).
Please set PRESET=F when executing the DIC1 and DIC2 OB in a raw.
However, the target will be at airmass 1.65 at the beginning of the night at the
end of April. Hence there will be little or no chance to execute the two epoch 6
OBs in a raw, within airmass 2.
Hence, Epoch 6 OBs should/might be executed in 2 consecutive nights.
Each epoch has different exposure time, hence THE OBs MUST BE SELECTED
AND EXECUTED IN THE RIGHT SEQUENCE (starting with epoch4 OBs, and
finishing with epoch6 OBs).
The program is a time critical one: please check the time critical
section for the execution constraints and the optimal observing windows.
Waiver Requests
Critical Observing Condition Constraints
Constraints are relatively relaxed. But it is important to have CLR sky
as we need to combine the 4 spectra and determine the continuum splope.
Seeing should be no worst of 1" just for SN issue (the nova is fading).
Note that, as the relative flux calibration of the object is critical to our project,
I am providing OBs for a spechphot standard to be executed on the same night of
the observations (of course in twilight).
Time-Critical Aspects
The program aims ad monitoring the spectroscopic evolution of the nova
during decline. Part B of the program is for the monitoring of the "late decline"
possibly into the nova nebular phase.
Here is the suggested schedule:
PART A of the program:
Epoch1: ASAP, possibly on Feb 12 --- DONE ON FEB 12 --- GREAT, THANK YOU
Epoch2: ~ 1 week after epoch 1 -- Feb 16-23 --- DONE ON FEB 19 --- EXCELLENT, THANK
YOU.
Epoch3: ~ 1 week after epoch 2 -- Feb 25-Mar 3 --- DONE on FEB 25 --- VERY GOOD,
THANK YOU!
PART B of the program:
Epoch4: ~ 2 weeks after epoch 3 -- Mar 10-20
Epoch5: ~ 2-3 weeks after epoch 4 -- Mar 30-Apr 10
Epoch6: ~ 3-4 weeks after epoch 5 -- second half of Arpil, possibly end of April
Any missed epoch, should be executed at the soonest. However, for no
any reason two epoch should be executed on the same night. Best scheduling is
if
any 2 epochs of part B of the program are be separated by at least 10-15 days (of
course
two close epochs are better than no data).
Please do you best ... thanks.
Special Execution Requirements
Please always execute the DIC1 and DIC 2 OBs on the same night in case
of epoch 4 and 5 observations. Execute the two OB of epoch 6 on two consecutive
nights (however should the seeing be very good, epoch 6 OBs can be executed on the
same night no matter the >2 airmass).
Please take care of the time critical aspects. Use common sense or contact me
in case the suggested schedule is no longer valid/applicable or in case of doubts.
Special Calibration Information
A specphot standard should be executed during the same night a given epoch
is observed.
As the specphot standard is not part of the calibration plan I am providing (as
suggested)
my own OBs.
In particular, I am providing a selection of 3 standards: one visible at the beginning
of the night (GD71), one visible about all night (GD108) and one for the second
half of the night (Feige 67). At each epoch pick the one you prefer according to
your observing schedule (I expect that USD will put the OBs back in the queue) I'll
be happy with any of them.
Of course there are 2 OBs per standard DIC1 and DIC2 with the same setup (but wider
slit) than the target OBs. Please execute the same standard at each epoch: i.e.
do not execute one standard for DIC1 and a different one for DIC2 on a given night.
[note: visibilty will be different in a couple of months]
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:28 2009
If you have comments, please contact usd-help@eso.org