README web version of /home/usg/OPS/MTS/readme_xml/readme_82505500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Spectroscopic monitoring of a recurrent nova in the LMC
The program consists on 6 epoch, 3 of which belong to part A (THIN and seeing 1.2)
and 3 to part B (CLR and seeing 1.0).
2 OBs have to be executed at each epoch: DIC1 346+580 and DIC2 437+760.
The acquisition of the second setup should be executed with preset=F to save
time (not accounted in the total execution time).
Each epoch has different exposure time, hence THE OBs MUST BE SELECTED
AND EXECUTED IN THE RIGHT SEQUENCE (starting with epoch1 OBs, and
finishing with epoch3 OBs -- part A of the program).
The program is a time critical one: please check the time critical
section for the execution constraints. The first epoch OB should be
executed AT THE SOONEST, VIRTUALLY Feb 12!!! "about simultaneously"
with Swift observations!! --- DONE THANK YOU!!!
Please check the time critical section for the optimal/suggested scheduling
of epoch 2 and 3 of this part of the program.
Waiver Requests
Critical Observing Condition Constraints
Constraints are relatively relaxed.
But later epochs require CLR sky for proper relative flux calibration between the
two DIC setups.
The seeing should be up to 1 in order to have a decent SNR, at the target magnitude.
Epoch1, 2 and 3 OBs belong to PART A of the program which has more relaxed constraints
(THIN and seeing 1.2).
This because the early decline of the nova is faster than the late one and is better
to catch the spectra than anything else. The seeing could be even overriden, as
soon as the OBs are repeated a sufficient number of times.
Time-Critical Aspects
The nova has already declined by several magnitudes since the time of
the proposal submission and should be at mag ~14 at the time of
writing (Feb 11). Hence the exposure time of the early epochs have
been revised with respect to the proposal.
The sequence of OB is aimed ad monitoring the spectroscopic evolution
of the nova during decline. Hence:
Epoch1: ASAP, possibly on Feb 12 --- DONE GREAT!
Epoch2: ~ 1 week after epoch 1 -- Feb 16-23
Epoch3: ~ 1 week after epoch 2 -- Feb 25-Mar 3
Epoch4: ~ 2 weeks after epoch 3 -- Mar 10-20
Epoch5: ~ 2 weeks after epoch 4 -- Mar 30-Apr 10
Epoch6: ~ second half of April
Any missed epoch, should be executed at the soonest. However, for no
any reason two epoch should be executed on the same night. Any two
epoch of Part A of the program should be separated by at least 5 days.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:28 2009
If you have comments, please contact usd-help@eso.org