README web version of /home/usg/OPS/MTS/readme_xml/readme_82503100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The goal of the observations is to get a visibility triplets on 2 components
of a YSO binary Z Cma. The two components are Z CMa NW and Z CMa SE separated by
100ms at PA=120deg.
NIR and V magnitudes might not be accurate since the Z CMa system is currently under
an outburst of 2 magnitude which may changes the repartition of flux. We have:
+ in Dec 1989 (1991AJ....102.2073K):
- Vtot = 9.5
- Htot = 5.1, with H(SE)=5.4 and H(NW)=6.5
- Ktot = 3.8, with K(SE)=5.1 and K(NW)=4.2
+ 2 Dec 2008 (Grankin et al. priv. comm.):
- Vtot = 9.04 , i.e. DeltaVtot = -0.5
Therefore we can anticipate: Htot = 4.6-5.1, Ktot= 3.3-3.8, H(SE)=4.9-5.4, H(NW)=6.0-6.5,
K(SE)=4.6-5.1 and K(NW)=3.7-4.2 depending on which component is undergoing the out
burst. The outburst might be also bluer. So we took the averaged values:
- Htot=4.8, H(SE)=5.1, H(NW)=6.2
- Ktot=3.5, K(SE)=4.8, K(NW)=3.9
We chose the UT2-UT3-UT4 configuration, but the program can also be conducted with
any other UT triplets (see Note of Table 15 of P1 proposal).
The acquisition might be tricky (see finding chart) since the UTs will resolve the
binary. We suggest to first acquire Z CMa and get the brightest component with IRIS
and check that the second component is there by applying an offset of -0.1*sin(120deg)=-0.086
arcsec in RA and 0.1*cos(120deg)=-.05 arcsec in Dec or the inverse quantity (unknown
position) and come back.
The sequence of acqusition would be then SCI_ZCMa_NW/CAL_HD45420/ZCMa_SE/CAL_HD60742
several times if time allows it.
Be careful the position of target Z CMa for NW and SE are the same since we do not
have the accuracy to have them. It is probably the position of the photocenter.
we want to observe the full Medium_K_1_2.1 band using FINITO with the minimum DIT.
We therefore took 200ms for the DIT.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate for each science star OB the corresponding calibrator
star OB (and vice versa) in the 'Instrument Comments' field ?
Did you check that your chosen calibrator is bright enough for the instrument
mode used ?
If you use calibrator stars which are not in the CalVin database, did
you specify their characteristics in the README file and in the OBs ?
Do you use the same DIT for pairs of science target and associated calibrator?
Are the magnitudes of science target and calibrator within +/- 1 mag
?
Did you verify that your coordinates are as accurate as possible (2Mass
coordinates recommended) and that they include proper motions if available ?
Did you specify the LST range of the calibrators such that they cover
the range from 30 min before the start of the LST range of the science target to
30 min after the end of the LST range of the science target ?
Last creation of page: Tue Oct 6 15:40:28 2009
If you have comments, please contact usd-help@eso.org