README web version of /home/usg/OPS/MTS/readme_xml/readme_82501002
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The target SAX J1808.4-3658 has been in an outburst since Sept. 21.
I have the three observations to monitor the modulation in the source's optical
light curve, seeking to determine the orgin of a modulation transition seen
in the light curves that were obtained in early October.
The target is estimated to have R = 19; however it could be fainter than estimated.
Therefore a 15 sec exposure time is set. In each of 1.5 hour observations, 100 15-sec
exposures would be made.
Because each OB can not be longer than 1 hour, two 44 min OBs are set.
------------------------------------------------------------------------
On Nov. 7, I have changed exposure time for each image to 60 sec. Therefore
in 1.5 hour, 25 60-sec images will be made.
Waiver Requests
Critical Observing Condition Constraints
The source is only visible in the early night.
Since the source is relatively bright, R~19 mag,
nearly no constraints are required.
Since we will use differential photometry, non-photometric
and thin cirrus conditions are OK.
Time-Critical Aspects
From previous observations, the target's outburst would last about 40
days.
As the current outburst started from Sept. 21, one month has passed since
the onset of the outburst. Therefore the observations should be conducted
as soon as possible, as it would be close to the end of the outburst.
Special Execution Requirements
A phase-coherent timing technique is used to determine the optical
modulation period accurately. The three observations should be made
on days 1, 2, 5+/-1, or alternatively, on days 1, (5+/-1), (5+/-1)+1.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:28 2009
If you have comments, please contact usd-help@eso.org