README web version of /home/usg/OPS/MTS/readme_xml/readme_82094100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
We aim at high signal to noise spectra to perform chemical studies. The
diagnostics of the spectra are in the small lines so we used the ETC to estimate
the total observing time such that the required signal to noise is reached for a
wide spectral range. The observations are standard point and shoot exposures. The
exposures per object are spread over several OBs. If possible, please complete target
per target. The name of the target can be found in the OB name. Thank you
Waiver Requests
Two approved waiver requests:
1) InstrumentSetupChange: Image slicer is replaced by slit
The LMC targets have airmass larger than 1.3 which is the limit in the manual for
use of image slicers.
submitted: 15:08:34 14 July 2008
approved: 07/15/2008 07:15 AM
2) TargetChangeRequest:
After Phase 1 deadline, we used additional information to refine our selection and
came to the conclusion that one of the targets, nl. J052026.38-695126.4, is not
relevant to our science case (chemical composition of post-AGB stars in the LMC).
We therefore requested a change of this target with two other targets, nl. J050944.90-684610.7
and J050631.82-714230.0.
submitted: 14:05:33 17 July 2008
approved: 07/17/2008 02:13 PM
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:28 2009