README web version of /home/usg/OPS/MTS/readme_xml/readme_82092200
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
PRE-IMAGING for 082.A-0922(A) - CFHTLS Wide field W2
Covering 170 square degrees in three patches of 49 to 72 square degrees through
the whole filter set (u*, g', r', i', z') down to i'=24.5, this survey will allow
the study of the large scale structures and matter distribution in the universe
through weak lensing and galaxy distribution, as well as the study of clusters of
galaxies through morphology and photometric properties of galaxies.
This project will focus on the calibration of the photometric redshift in 12 fields
of the patch W2 (7deg x 7deg).
Center of patch W2:
08:54:00 -04:15:00 (RA(2000)h:m:s and DEC(2000)d:m:s).
Targets:
========
W2m0p1 08:54:25.258 -02:59:12.940
W2m0p2 08:53:39.424 -02:19:22.740
W2m0p3 08:53:37.758 -01:39:12.090
W2p1p1 08:57:10.991 -03:25:08.420
W2p1p2 08:58:20.408 -02:39:31.160
W2p1p3 08:58:35.276 -01:46:55.930
W2p2p1 09:01:02.700 -02:59:10.880
W2p2p2 09:00:39.887 -02:21:08.330
W2p2p3 09:02:55.413 -01:21:02.800
W2p3p1 09:06:04.700 -03:16:21.000
W2p3p2 09:04:24.130 -02:44:39.470
W2p3p3 09:05:55.460 -01:22:43.870
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:28 2009
If you have comments, please contact usd-help@eso.org