README web version of /home/usg/OPS/MTS/readme_xml/readme_82081101
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is the MOS run (082.C-0811(B)) of previously done pre-imaging run
(082.C-0811(A)).
A total of 12 OBs have been prepared. Each set of 4 OBs corresponds to the three
pointings
of the MOS observations. The integration time in each OB is 1h in one unique exposure.
Considering acquisition and night calibrations, a total observation time of 1:27:30
per OB is requested.
A waiver request to exceed the execution time of 1h was submitted and aproved.
We have asigned different priorities to our OBs following these criteria:
- The priority of the three pointings in descendend order is: VIMOS-N, VIMOS-E and
VIMOS-S
- The observation of 2 OBs per pointing guarantee a minimum of our scientific objective.
- The observation of the three pointing maximize the number of objects and interesting
individual cases.
Hence, we require to observe first 2 OBs of the VIMOS-N pointing, second 2 OBs of
VIMOS-E, third 2 OBs of VIMOS-S and then repeat this structure again.
Waiver Requests
A waiver request for the programme 082.C-0811(B) to exceed the extend
the execution time to 2h
was submitted on 30/10/08 01:57 and aproved by Michael Hilker on 30/10/08 13:24.
Nevertheless,
following his recommendation, we decided not to exceed the execution time of 1.5h.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
We have asigned different priorities to our OBs following these criteria:
- The priority of the three pointings in descendend order is: VIMOS-N, VIMOS-E and
VIMOS-S
- The observation of 2 OBs per pointing guarantee a minimum of our scientific objective.
- The observation of the three pointing maximize the number of objects and interesting
individual cases.
Hence, we require to observe first 2 OBs of the VIMOS-N pointing, second 2 OBs of
VIMOS-E, third 2 OBs of VIMOS-S and then repeat this structure again.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:27 2009
If you have comments, please contact usd-help@eso.org