README web version of /home/usg/OPS/MTS/readme_xml/readme_82061401
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Run B represents the start of a small trigonometric parallax program
with the first three epochs of observations.
We require heavily-overhead dominated 12 minutes per epoch and object.
We request for multiple dithers in the $z$-band for accurate astrometry
(differential refraction will be minimized) and $I$- and $V$-band images
since we need colour information on the background reference stars.
The first two individual dates of observation (epochs) for each of the
two targets of run B should be separated by at least about three weeks.
We specified a time interval from beginning of September (in case that
observations can be carried out already before the official start of P82)
to mid-October, and from mid-October to end of November, respectively.
The third epoch observations are scheduled for March 2009.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:27 2009
If you have comments, please contact usd-help@eso.org