README web version of /home/usg/OPS/MTS/readme_xml/readme_82045101
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This run is for hard ToO observations of short GRBs. These will be triggered
for bursts which are young (<~3days) but which do not fall within the remit of
the RRM runs. Depending on the
As with the other runs the observations for which there are OBs represent a superset
of those which will actually be performed, the precise observations may include
both spectroscopy and imaging on the afterglow of the burst or its host galaxy.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
This is a hard ToO and should normally be executed on the night which
it is requested. If the ToO is trigger on the same night as the burst then ideally
the observations should begin immediately upon the receipt of the ToO request, or
a soon as is practiable thereafter. Further details of the reqested observations
and response times will of course be sent with the relevant request.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:27 2009
If you have comments, please contact usd-help@eso.org