README web version of /home/usg/OPS/MTS/readme_xml/readme_82017401
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a pre-imaging run for MOS mask preparation for program 382.C-0174(A),
consisting of 3 OBs for 3 fields in Cham I. Each OB consists of one exposure of
10 seconds and one exposure of 120 seconds, both in the R-band.
Within the airmass constraint, these pre-imaging OBs should become executable in
the morning hours starting from about early to mid December 2008. This leaves about
3-3.5 months for the execution of the pre-imaging, preparation of the MOS masks
+ OBs and execution of the science OBs. We therefore hope you will be able to execute
this pre-imaging run during the month December.
Waiver Requests
Critical Observing Condition Constraints
Airmass constraint: VIMOS pre-imaging and MOS are required to be obtained
within 2 hours of the meridian. The targets rise to an airmass of about 1.65 at
the meridian, hence the airmass constraint of <1.7-1.8 (differs per OB).
Seeing and lunar phase: constraints of <=1.0" seeing and 0.7 lunar illumination
were chosen to obtain sufficient signal-to-noise for the I=22 magn sources in our
fields, based on the ETC.
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:26 2009
If you have comments, please contact usd-help@eso.org