README web version of /home/usg/OPS/MTS/readme_xml/readme_82017400
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Program 382.C-0174(A) consists of 3 OBs for 3 fields in Cham I to take
very deep multi-object spectroscopy in 1 band: LR-Red. Each OB consists of 4 exposures
of 1610 seconds (26 minutes and 50 seconds).
The execution time for each individual OB is 2h 16m 00s. These longer than 1 hour
OBs were approved in Waiver Request 382.C-0174(A).01.WAV.
Pre-imaging was taken on Dec 17, 19 and 24 of 2008 in program 382.C-0174(B). The
guide stars selected there are presumed to be used again for these MOS OBs.
For Field 1, vignetting by the guide star is anticipated to occur in quadrant 3,
and a little bit in quadrant 4.
Within the airmass constraint, these pre-imaging OBs should be executable every
night from January until April 2009.
Waiver Requests
One Waiver Request (382.C-0174(A).01.WAV) to allow for the execution of
OBs longer than one hour was submitted on January 20, 2009 and accepted on January
21, 2009 (received acknowledgement from Marina Rejkuba).
Critical Observing Condition Constraints
Airmass constraint: VIMOS pre-imaging and MOS are required to be obtained
within 2 hours of the meridian. The targets rise to an airmass of about 1.65 at
the meridian, hence the airmass constraint of <1.7-1.8 (differs per OB).
Seeing and lunar phase: constraints of <=1.0 seeing and 0.7 lunar illumination
were chosen to obtain sufficient signal-to-noise for the I=22 magn sources in our
fields, based on the ETC.
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:26 2009
If you have comments, please contact usd-help@eso.org