README web version of /home/usg/OPS/MTS/readme_xml/readme_81500401
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Long slit spectroscopy and broad band B, V, R & I imaging of Comet
67P/Churyumov-Gerasimenko. As this is a moving target the actual position, differential
tracking rates and slit orientations must be obtained from the attached ephemeris
files for the exact time of observation. Please be aware that the listed expected
brightnesses are total magnitudes of an extended object and the central condensation
might appear up to 5 magnitudes fainter. The comet should nevertheless be easily
discernible on the acquisition images requested for the spectroscopy OBs when compared
to the usual DSS-based finding charts, therefore no additional finding charts are
necessary. The accuracy of the given ephemeris is sufficient to allow fast acquistion
in all OBs. As all OBs refer to the same target they could in principle be executed
consecutively according to the given priority. However due to the viewing geometry
the target can only be followed during the last second half of the night in end
of June, so that the observations need to be spread over several (if possible) consecutive
nights. As we need spectra of a solar analogue star (taken with the same instrumental
setup as the comet) in addition to ESO's standard calibration plan, we included
an appropriate observing block named: SolAna_cg67p_lss. This part B of the programme
should be executed somewhen between June 20th and July 10th, however, this is not
a critical time constraint.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
As we would like to monitor the changes in the coma of this comet as it
comes ever closer to the sun, we need to sample its orbit about every four to six
weeks. Therefore this part B of programme 281.C-5004 should be executed sometime
between June 20th and July 10th. This is not a critical time constraint however.
Special Execution Requirements
As all OBs refer to the same target they could in principle be executed
consecutively according to the given priority. However, due to the viewing geometry
the target is visible only during the second half of the night in end of June, so
that the OBs need to be spread over several (if possible) consecutive nights.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:25 2009
If you have comments, please contact usd-help@eso.org