README web version of /home/usg/OPS/MTS/readme_xml/readme_81082801
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Spectro-polarimetry observations of a QSO, SX 55275 (02:25:50.673, -04:21:42.106)
with the GG435 filter with 2 position angles of the retarder plates, at 0 deg and
45 deg, to measure linear polarization.
We choose the fast option and divide the observations in 6 OBs, 3 OBs with retarder
plate at angle = 0 and 3 with retarder plate at angle = 45. For our science goal
we need at least 1 measurement with two retarder angles, so perform 1 OB with ret.
plate = 0 and 1 with ret. plate = 45, then go to the next OBs.
The acquisition is done on a reference star (02:25:53.689 -04:22:11.037) using the
BESSEL_R filter. We request a 3 sec exposure that will yield a S/N = 200 over the
PSF area and a S/N = 24 at central pixel. The ROT angle = 57.3241 deg will put both
the reference star and the target on the slit. The reference star is at 53.6 arcsec
from the target to the South East. The r-band magnitudes are 17.4 and 21.6 for the
reference star and the target, respectively.
After slit positioning we request an offset of alpha=-45.105 (to the west) arcsec
and delta=+28.930 (to the North) to center the slit on the target. The reference
star will still be in the slit after offsetting.
The science observation sequence is divided in 1 exposure (NEXP=1) and 2 offsets
(NOFF=2) along the slit at -9 arcsec and 6 arcsec. Each exposure lasts 1530 sec.
The retarder plate will be at the same angle during the OB, either 0 or 45 degrees.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:25 2009
If you have comments, please contact usd-help@eso.org