README web version of /home/usg/OPS/MTS/readme_xml/readme_81080000
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Pre-imaging to be done at the earliest convenience for MOS programme in
P81; conditions: within 2 hours of culmination, grey time, THN, <=0.8" seeing.
This is standard pre-imaing for a VIMOS MOS run of an area of sky surrounding a
high-z galaxy cluser which is covered in four pointings: Pointing 1 (SE of cluster
centre), Pointing 2 (NE of cluster centre), Pointing 3 (SW of cluster centre), &
Pointing 4 (NW of cluster centre).
I have chosen guide stars with limited vignetting. If other guide stars need to
be used on the night, please try to limit vignetting in the central region of the
overall field as we are particularly keen to target sources in this region. (I.e.
please try NOT to allow vignetting in the NW corner of Pointing 1, SW corner of
Pointing 2, NE corner of Pointing 3, and SE corner of Pointing 4.)
Waiver Requests
Critical Observing Condition Constraints
Pre-imaging to be done at the earliest convenience for MOS programme in
P81; conditions: within 2 hours of culmination, grey time, THN, <=0.8" seeing.
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Pre-imaging to be done at the earliest convenience for MOS programme in
P81; conditions: within 2 hours of culmination, grey time, THN, <=0.8" seeing.
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:25 2009
If you have comments, please contact usd-help@eso.org