README web version of /home/usg/OPS/MTS/readme_xml/readme_81077500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The goal of this project is twofold: first, to make a complete census
of short-period variable stars over the observed field and study the gradients using
the properties of these variables; and second, to obtain
a deep color magnitude diagram to study the star formation history and spatial extension
of this galaxy.
Therefore, we prepared 25 equal OBs with Cetus centered on chip 4 for a good sampling
of the variable stars light curves, plus one OB where the galaxy is centered on
chip 2 in order to cover the gaps of the previous
pointing and sample the other side of the halo of Cetus.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Since Cetus is visible with an airmass <1.5 for at least 3 hours per
night during 24 dark nights this semester, there are no strong temporal constraints.
However, it would be a plus if, during one or two nights, several (~4-6) OBs could
be observed back to back.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:25 2009
If you have comments, please contact usd-help@eso.org