README web version of /home/usg/OPS/MTS/readme_xml/readme_81075301
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Spectroscopy to determine the orbital period of up to five red dwarf -
white dwarf systems selected on their colours in the Sloan Digital Sky Survey, as
well as the VLT pre-imaging done in 081.D-0753(A). Set-up is to use the 1200 holographic
grating with (3x300s) integration times within one OB. Each source has 6 OBs associated
with it, labeled SDSSXXXX-YY_01 through ...YY_06, where XXXX-YY are the short-form
coordinates of the source.
Phase 2 observations are submitted as the A-run imaging is verified.
Please note carefully the observing order:
- Spec_SDSSXXXX-YY_01 is the first OB to be executed on source SDSSXXXX-YY.
The following OBs need to be executed according to the following time scheme:
-Spec_SDSSXXXX-YY_02: 4 hours after Spec_SDSSXXXX-YY_01
-Spec_SDSSXXXX-YY_03: 1 day after Spec_SDSSXXXX-YY_01
-Spec_SDSSXXXX-YY_04: 2 days after Spec_SDSSXXXX-YY_01
-Spec_SDSSXXXX-YY_05: 3 days after Spec_SDSSXXXX-YY_01
-Spec_SDSSXXXX-YY_06: 4 days after Spec_SDSSXXXX-YY_01
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:25 2009
If you have comments, please contact usd-help@eso.org