README web version of /home/usg/OPS/MTS/readme_xml/readme_81074800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is programme does straightforward medium resolution spectroscopy
of hot central stars of planetary nebulae. The nebulae are extended and faint and
should not cause any complications.
Observations are split into two OBs for the faintest stars of the sample. Although
observations are not time critical, high priority should be given to the second
OB after the first was carried out.
Most target stars are in somewhat crowded areas. Two FCs are attached to each OB.
One showing
the full FORS FoV and the other a zoom of the region around the target.
Note: We replaced two objects from our phase 1 target list (PNG311.0+02.40 and PNG014.6+04.8)
with two other ones, because we don't consider the two on our original list good
candidates anymore. Both new ones were selected from the same master list using
the same criteria, as layed down in the phase I proposal.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:25 2009
If you have comments, please contact usd-help@eso.org