README web version of /home/usg/OPS/MTS/readme_xml/readme_81069402
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The runs in this proposal (A-E) monitor five planetary transits (one for
each observing run); therefore, timing constraints are critical. The observation
of each transit will last 5.2 consecutive hours (see \"time-critical aspects\")
Also, note important note regarding seeing requirements on \"Special execution requirements\"
Target coordinates given in the OB do not place the star at the center of the field.
Instead they place the target near the upper left corner where, from previous experience
with FORS, a nearby bright star will be placed outside the field of view to minimize
its contamination. It is important to leave this star outside the frame even if
this means that the target object will not be centered in the field.
Just in case, the precise coordinates of OGLE-TR-111 are
ra: 10h 53m 17.91s
dec: -61d 24m 20.3s
The first finding chart shows a full frame previously obtained with FORS centered
at the coordinates specified in current OB. In it, a white rectangle shows approximately
the area zoomed-in by the second finding chart, where the target has been marked.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
This program observes 5 transit events (one per each run) that happen
only at precise times. The observations must be started and finished precisely
at the time indicated at the \"time interval\" section, and repeated below:
Run Start End
A 2008-04-21T22:45:00 2008-04-22T03:57:00
B 2008-04-25T22:55:00 2008-04-26T04:07:00
C 2008-04-29T23:20:00 2008-04-30T04:32:00
D 2008-05-03T23:40:00 2008-05-04T04:52:00
E 2008-05-12T00:20:00 2008-05-12T05:32:00
The first runs start very close to sunset, therefore, just start observing as early
as possible.
One additional alternative date is given in \"time intervals\". The airmass going
to be larger in this date; therefore, it can ONLY be used if observing conditions
are not achieved in their respective original date:
RUN Start End
alt 2008-05-20T01:00:00 2008-05-20T06:12:00
The OB is larger than the total allocated time of 5.2 to account for any overhead
overestimation by p2pp. Please, just abort the observations once they reach the
finishing time.
Special Execution Requirements
Since there is no offset in this run, please verify at the beginning that
the target star does not lie in a known bad pixel.
Peak counts of the target star should remain below the saturation level (SL), but
I also want observing parameters to remain as fixed as possible. Therefore, at
the beginning of the observations, please check the peak counts of the target, if
they are close to ~0.8SL then decrease the integration time by 3 seconds intervals
until the counts are below 0.8SL, and change NEXPO accordingly to make sure the
whole time span is sampled (see time-critical aspects).
To try to keep the parameters constant, only decrease the integration time again
if peak counts go above 0.9SL, and never increase the observing time back.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:25 2009
If you have comments, please contact usd-help@eso.org