README web version of /home/usg/OPS/MTS/readme_xml/readme_81067200
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
OB names target comments
--------------------------------------------------------------------
PRE-COSMOS-ZC403027_P81-0 K=20.23 H_alpha line expected near 2.284um
PRE-COSMOS-ZC409985_P81-0 K=20.63 H_alpha line expected near 2.265um
PRE-COSMOS-ZC410123_P81-0 K=21.02 H_alpha line expected near 2.100um
PRE-COSMOS-ZC405226_P81-0 K=20.49 H_alpha line expected near 2.158um
PRE-COSMOS-ZC404073_P81-0 K=20.26 H_alpha line expected near 2.331um
PRE-COSMOS-ZC412564_P81-0 K=19.43 H_alpha line expected near 2.069um
The main characteristics of the observations are as follows.
- The targets have no particular priority: they are all required
as pre-imaging for a subsequent run 081.A-0672(B).
- For this pre-imaging run, there is one OB per target. OBs are named after
the targets and with "-0" appended.
- The DITs for our exposures of our faint targets are 600s.
- The brightest spectral feature of the targets is H_alpha in emission;
the expected wavelength is given in the table. There are no previous
spectroscopic observations in the near-IR so the Ha fluxes and
morphologies are not known. The purpose of this pre-imaging run
is to identify the best targets for follow-up in run 081.A-0672(B)
with AO based on actual Ha brightness and distribution.
- We are using the 250mas scale, with field of view (FOV) of 8"x8".
We use "on-source" dithering for all targets: they are sufficiently
small to fit in the overlap region. Briefly, two successive exposures
are dithered by roughly 1/2 of the FOV (about 4 arcsec), so that the
unregistered frames can be subtracted pairwise for background subtraction.
Small jitters about the main dithering positions are used to minimize
the number of redundant positions.
Remarks on the finding charts:
- Two finding charts are provided for each target/OB, following the instructions
for SINFONI.
(1) The first one (SINFONI_{sourcename}_fchart1.jpg) have wider FOV; a large and
a small black square show regions 1' x 1' and 8" x 8" centered on the target;
the offset star for acquisition is labeled "R1".
(2) The second one (SINFONI_{sourcename}_fchart2.jpg) is zoomed in on the target,
with the solid-line square showing the full 8" x 8" FOV at 250mas scale.
In addition, two dashed-line squares show
the two main dithering positions of the sequence, where the source lies
in opposite quadrants for any two successive exposures (explained above).
Waiver Requests
One Waiver Request was submitted:
081.A-0672A.01.WAV: for an increase of the OB execution time limit to 1h30.
(submitted on 11 February 2008, approved on 11 February 2008)
A Target Change Request was also submitted, and accepted on 13 February 2008
Critical Observing Condition Constraints
Transparency constraints:
- For all OBs, CLEAR sky transparency conditions is acceptable, as specified
in the proposal.
Moon constraints:
- For all targets, conforming to our proposal, there is no constraint on
lunar phase and so the illumination is set to 1.0.
Seeing constraints:
- Seeing < 0.8\", as specified in the proposal.
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate the magnitude of the brightest object in the field in
each SINFONI OB?
If you are using the AO: Did you indicate for every OB the magnitude
of the guide star, and its distance to the target (if any)?
If you submitted OBs for standard stars, did you use the provided StandardStar
templates?
If you are using a specific offset pattern or position angle: did you
check carefully the definition in the manual?
Did you make really sure that none of your OBs ever saturates the detector?
If you are using the AO: did you enter the correct Strehl Ratio (on-axis,
K-band) AND the seeing value in the constraint set?
Last creation of page: Tue Oct 6 15:40:25 2009
If you have comments, please contact usd-help@eso.org