README web version of /home/usg/OPS/MTS/readme_xml/readme_81060901
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
We plan to collect interferometric data with AMBER@VLTI to constrain the
binary nature of the nearby Classical Cepheid X Sgr. An accurate FGS@HST
trigonometric parallax for this object is already available and it is
used to calibrate the slope of the Period-Luminosity relation for Galactic
Cepheids. However, it is not clear yet whether X Sgr is a binary, thus
affecting the precision of its absolute distance. Current measurements
will help us to investigate the binary nature of the source. If feasible,
we also plan to use the measurements to provide an accurate estimate of X
Sgr angular diameter and to derive an accurate estimate of its present mass.
We plan to obtain visibilities on 2 different AT triplets, 1 observation
on the short baselines (E0-G0-H0) (Run A) and 5 more on the long ones
(A0-K0-G1) belonging to this run of the programme, thus ending up
with 6 visibility measurements.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
We would like to spread the 5 observations over the period.
This observing strategy will allow us to measure the
target visibility at different pulsation phases. Note that the
pulsation period of X Sgr is approximately 7 days. Therefore,
to accomplish the scientific goal the distance between different
observing nights should not be multiples of 7 nights.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate for each science star OB the corresponding calibrator
star OB (and vice versa) in the 'Instrument Comments' field ?
Did you check that your chosen calibrator is bright enough for the instrument
mode used ?
If you use calibrator stars which are not in the CalVin database, did
you specify their characteristics in the README file and in the OBs ?
Do you use the same DIT for pairs of science target and associated calibrator?
Are the magnitudes of science target and calibrator within +/- 1 mag
?
Did you verify that your coordinates are as accurate as possible (2Mass
coordinates recommended) and that they include proper motions if available ?
Did you specify the LST range of the calibrators such that they cover
the range from 30 min before the start of the LST range of the science target to
30 min after the end of the LST range of the science target ?
Last creation of page: Tue Oct 6 15:40:24 2009
If you have comments, please contact usd-help@eso.org