README web version of /home/usg/OPS/MTS/readme_xml/readme_81048601
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
June 4, 2008
(i) We have prepared OBs for two of the seven allocated runs. We shall prepare OBs
for the remaining runs later. See separate waiver request box.
(ii) The targets in this program are generally extremely red i.e. i-z(AB)>2.2
and often undetectedto i(AB)=23.5 so acquisition must be carried out in z. An exposure
time of ~60 secs ensures a S/N>20 detection so that acquistion can be done on
the object itself.
(iii) The finding charts are produced from the UKIDSS WFCAM Y band images and SDSS
z band images. The Y band has a central wavelength of around 1 micron between z
and J.
Waiver Requests
A Waiver Request was approved for an extension of the deadline for OB
submission because we needed to wait for the results of followup imaging of our
candidate targets (Support Request Number USD-22053, for ESO reply see below). We
have prepared OBs for two targets (runs 381.A-0486(A) and 381.A-0486(B)). We shall
prepare OBs for the remaining runs later.
Support Request Number USD-22053
ESO response:
01/24/08 14:36:51 bziegler
Dear Dr. Venemans,
I accept your request for a deadline extension for OB submission.
Just remember that there may be a time delay between your OB submission and
the
queueing of your runs on Paranal.
Sincerely,
Bodo Ziegler
ESO User Support Astronomer
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:24 2009
If you have comments, please contact usd-help@eso.org