README web version of /home/usg/OPS/MTS/readme_xml/readme_81041301
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Photometric follow-up of Corot transiting planets
Time-critical, long sequences of images in a single filter should be executed.
They are all occuring during the first half of the night.
Please check for saturation on the main target as indicated in the finding chart
(white circle). If needed, please adapt the exopsure time to avoid saturation, and
increase accordingly the number of exposure to have the same duration of the sequence.
Thanks!
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The series of images must be executed on the following epochs (also indicated
in the OBs)
Sequence usually starts ASAP after the twilight and lasts until the field sets.
Exact duration of each depends on the transit duration and timing.
corot-3-25Aug: night 25-26 Aug
SRc01-E1-1773-1Sept: night 1-2 Sept
corot-2-8Sept: night 8-9 Sept
LRc01-E2-1145-13Sept: night 13-14 Sept
LRc01-E2-1055-Sept: night 26-27 and 27-28 Sept (filter sequence V, R, I, V, R, I,
...)
Special Execution Requirements
Please check for saturation of the main target. Exposure times were calculated
for median seeing of 0.8". The counts on the main target should be about 50-70%
of the linear regime of the detector. If needed, please adapt the exposure time
to avoid saturation, and increase accordingly the number of exposures to have the
same duration of the sequence. Thanks!
The field center is always shifted wrt to the main target position (marked in the
finding chart with a white circle) by about 30-50" in RA and DEC.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:24 2009
If you have comments, please contact usd-help@eso.org