README web version of /home/usg/OPS/MTS/readme_xml/readme_81031800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The aim of this program is to measure the radial velocity variation of
the main-sequence
donor star and the temperature of the white dwarf in a cataclysmic variable of the
SW Sextantis class. These systems are typically in a state of high mass transfer
rate, where the accretion disc dominates the optical light. However, during occasional
low states, the mass transfer ceases, and both stellar components can be observed.
The observations have therefore to be carried out as a ToO. This program consists
of 6h FORS2 spectroscopy, that has to be carried out in a contiguous fashion in
order to sample the
entire orbital period of the system (which is around 4h for all targets).
Apart from the spectrophotometric standard star observations (whose OB's may be
executed either before or after the science target OB's), the strategy is to be
on the science target continuously, i.e. executing the science OB's in a row (see
"Special Execution Requirements").
Waiver Requests
A waiver request was submitted to execute the allocated 6h in a contiguous
way, i.e. all OBs in this program should be observed consecutively (according to
the order detailed in "Special Execution Requirements"). The waiver was approved
(contact: Bodo Ziegler)
As a consequence, each OB contains a target acquisition. Obviously, if all the OBs
are carried out in a contiguous sequence, no acquisition is necessary for all of
them as the science target will always be centred on the slit.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Please execute the Science Target OBs in the following continuous sequence:
Blue-0
Red-0
Red-1
Blue-1
Red-2
Red-3
Blue-2
Red-4
Red-5
Red-6
Red-7
The blue spectra are necessary to measure the white dwarf temperature. As the system
is eclipsing, the interleaving of three blue spectra in between the red ones assures
that at most 1 blue spectrum is taken during the eclipse (when the white dwarf is
invisible). This
frees the observation from additional orbital phase constraints.
The CAL OB's (spectrophotometric standard star) can be executed either before or
after the science target run depending on which standard star is observed. The exposure
time is fixed at 60s which is fine with the V=15 standards. Please reduce the exposure
time to 15s if a brighter (V~12) standard is selected.
Special Calibration Information
ToO Information
This ToO does not need a rapid response. The low states in the SW Sextantis
stars last typically up to a few months, and an activation within 2-3 weeks is sufficient.
The target stars are photometrically monitored regularly using the SMARTS telescopes.
Should a low state be detected in one of the targets (and it is visible for sufficiently
long) we will activate the ToO.
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:24 2009
If you have comments, please contact usd-help@eso.org